BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 30, 2021 at 8:00 PM

Updated January 26, 2024

Site work and renovation of a mixed-use development in Milwaukie, Oregon. Completed plans call for the renovation of a educational facility; and for site work for a playground / park / athletic field.

The work of the contract consists of a new secure entry door and new walking path around playfields Protests, Technical Questions, Requests for Clarification or Changes of Specifications and/or Bidding Requirements, including Substitution Requests, must be received by the purchasing specialist in writing no later than seven (7) calendar days prior to bid closing date and time. Bidders shall comply with all BOLI and CCB requirements as adopted in Senate Bill 477 (effective January 1, 2006) including all filing, notification, and payment requirements; retainage for payment for labor, and the filing of a $30,000 public works bond with the Oregon Construction Contractors Board. The Public Works Bond shall be obtained from a corporate surety authorized to do business in this state. First-tier subcontractor lists, if applicable, shall be submitted, preferably in a separate envelope (or email), by 4:00 PM Pacific Time, on March 31, 2021. MINOR IMPROVEMENTS TO EXISTING ARDENWALD ELEMENTARY SCHOOL INCLUDE: (1) NEW PERVIOUS ASPHALT WALKING PATH IN AN EXISTING FENCED FIELD AND (2) A NEW DIRECT SECURE ENTRANCE INTO THE ADMINISTRATION RECEPTION DURING SECURE SCHOOL HOURS BETWEEN THE START AND END OF SCHOOL. The Work of the Contractor consists of Construction of building upgrades at Ardenwald Elementary School as indicated on Contract Documents prepared by BBL ARCHITECTS and their consultants. Without force and effect on requirements of contract documents, the description of the work of the contract can be summarized as follows: 1. Removal and replacement of entry mat at Main office area. 2. Addition of aluminum storefront windows and door at Main office area and demolition of existing brick and metal stud wall to allow this addition. 3. Relocation of access control to this new location. 1. Maintain the existing building in a safe and weathertight condition throughout the construction period. Repair damage caused by construction operations. Take all precautions necessary to protect the building and its occupants during the construction period. 2. Keep public areas such as hallways, stairs, elevator lobbies and toilet rooms free from accumulation of waste material, rubbish, or construction debris. 3. Smoking or open fires will not be permitted within the building enclosure or on the premises.

Post-Bid

Educational

Public - County

Renovation, Site Work

10

23

4

4

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
162
Active Projects
87
Bidding Soon
873
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2021

June 18, 2021

Project location map

8950 SE 36th Ave, Milwaukie, OR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.