BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Boring, Oregon. Completed plans call for site work for a water / sewer project.

Prospective Bidders will need to sign in to download the information and that information will be accumulated for a Plan Holders List. Prospective Bidders are responsible for obtaining any Addenda electronically. Engineers Estimate: $280,000.00 Contact Information : Procurement Process and Technical Questions: Tralee Whitley at TWhitley@clackamas.us Prevailing Wage Rates requirements apply to this Project because the maximum compensation for all Owner-contracted Work is more than $50,000. Contractor and all subcontractors shall comply with the provisions of ORS 279C.800 through 279C.870, relative to Prevailing Wage Rates. The Bureau of Labor and Industries (BOLI) wage rates and requirements set forth in the following BOLI booklet (and any listed amendments to that booklet), which are incorporated herein by reference, apply to the Work authorized under this Agreement: Prevailing Wage Rates for Public Works Contracts in Oregon, January 1, 2022, which can be downloaded electronically. Clackamas County encourages bids from Minority, Women, and Emerging Small Businesses. Contractor to perform all work necessary to install a well capable of producing approximately 80 gallons per minute ("gpm") in accordance with the State of Oregon Well Construction Standards, connection and testing of the well and control systems, and site cleanup as identified in the following: The well shall be drilled, cased and sealed down through the Troutdale aquifer, and into the basalt aquifer to avoid hydraulic connection with the Clackamas River, in order to be eligible for a water rights within 1/4 mile of the river. The well shall be constructed to develop water from a single basalt aquifer, and have no more than 100 feet of open interval in the basalt. New Well: 1) Acquire OWRD Start Card 2) Contractor will be responsible for staging and securing work site while on the property. 3) Drill well with minimum 8" casing, to proper depth to get acceptable flow of water from the basalt aquifer, assuming similar conditions as described in the nearby Barton West well (CLAC 70813), and aquifer encountered has sufficient capacity and acceptable water quality. 4) Construct and install well to meet potable drinking water standards. 5) Drill, construct, case, and seal well into the basalt aquifer in accordance with OAR 690- 210-0150 to ensure hydraulic separation necessary for pursuing water right (which County is pursuing separately from this Scope of Work). 6) Install minimum of a 15 HP pump, capable of pumping 80+ gpm. 7) Install proper wellhead with pit-less adapter and locking wellhead cap. 8) Stub out an additional water line with backflow prevention device for future connection to service Day-Use water system ) Install all necessary accessories and controls to create an operable water system, including properly sized pressure tank(s), pipe, valves, and wiring, in existing pump house. 10) Connect new system to existing booster pump and water lines running up to the East Campground. 11) Ensure control systems function for both future Day-Use system and existing East Campground Irrigation system. 12) Test well and file proper paperwork to record the new well. 13) Contractor will provide a minimum of one (1) year warranty on workmanship and materials. It is understood at all prospective bidders will do due diligence and proper site visitation on their own. All technical questions should be sent to TWhitley@clackamas.us

Award

Water / Sewer

$394,675.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
106
Active Projects
59
Bidding Soon
1,055
All Active Projects
383
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2022

April 7, 2022

img_map_placeholder

19009 SE Barton Park Rd, Boring, OR

Find better projects. Build better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.