BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 24, 2021 at 8:00 PM

Updated September 15, 2023

Site work and renovation of a water / sewer project in Mount Pleasant, South Carolina. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Mount Pleasant Waterworks (MPW) is pre-qualifying all General Contractors for the CSWWTP Headworks Rehabilitation Project (Project). Only those contractors with significant experience and expertise will be invited to bid on the Project as demonstrated through this Pre-Qualification process. Pre-Qualification is a mandatory requirement for bidding on the Project. Potential bidders shall have indepth experience in the rehabilitation/replacement of existing water/wastewater structures including dealing with the construction/installation issues described below. All requests for the RFQ and any questions regarding this Solicitation shall be directed to Mr. Kirby Dobberfuhl, PE, Black & Veatch, (843) 693-0211, dobberfuhlK@bv.com. The Owner (MPW) reserves the right to amend the RFQ at any time and only those contractors registered with Black & Veatch will receive amendments. The Project consists of rehabilitation and modifications to the Owner's existing headworks structure and process equipment at the Center Street Wastewater Treatment Plant, rated for 3.7 MGD annual average flow rate. Construction may include the following: Maintenance of plant operations (MOPO) - CSWWTP must remain operational. Rehabilitation of the headworks structure Retrofitting, replacing and/or removing & reinstalling process equipment Installation of electrical equipment. The Work includes, but is not limited to, all piping and valves, grading and paving, sedimentation and erosion control, electrical work, and all other work necessary to render the facilities complete and operational. All work will be completed in accordance with local, state, and federal permits and regulations. The Owner shall not be responsible for any cost incurred by contractors because of participation in this selection process. Each contractor shall bear its own expense in connection with the preparation and submission of materials and the provision of any supplemental information requested. The Owner shall have no liability for cost incurred by contractors in connection with the review and evaluation of qualification materials and any findings and determinations made therefrom. This is not a solicitation for proposal.

Bid Results

Water / Sewer

$2,000,000.00

Public - City

Renovation, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
66
Bidding Soon
693
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2021

September 15, 2021

Project location map

Center St, Mount Pleasant, SC

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.