Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a detention facility in Woodburn, Oregon. Completed plans call for the renovation of a 5,500-square-foot, one-story above grade detention facility.
The purpose of the ITB is to establish a Contract for MYCF West Cottages 3 & 4 (Crater & Fossil) Renovation for the benefit of Oregon Youth Authority. The Work contemplated under this Contract includes all labor, materials, transportation, equipment and services for, and incidental to, the completion of all construction Work in connection with the project described in the Contract Documents.' In response to the Governor's Executive Order No. 20-12 "Stay Home, Save Lives" and related Executive Orders and their workplace restrictions and social distancing requirements, DAS will be scheduling appointments for the mandatory pre-bid conference(s) with all interested parties. Interested parties must contact the DAS single point of contact listed in Section C.1.1.1 by 9:00 AM on March 29, 2021 to schedule an appointment. To comply with social-distancing guidelines, DAS may, in its sole discretion, conduct one or more pre-bid conferences at within the times listed on the pre-bid conference date,. If more times are needed to accommodate interested parties, DAS will select additional dates and times and issue an addendum to the ITB. No more than one representative from each interested party will be allowed on-site for each scheduled appointment. All interested party representatives must comply with social-distancing guidelines and other requirements of the Governor's Executive Order No. 20-12 and related Executive Orders during the appointments. Any statements made at the pre-bid conference appointments will not change the Plans, Specifications or other Contract Documents, unless an Addendum has been issued from DAS and advertised on the ORPIN System identifying any such change. The following range is a project estimate for bonding purposes: 6.2 - 10.2 million PROJECT COMPLETION DATES: PROJECT START DATE: No later than May 24, 2021. The actual start date will be agreed to between the Owner and the winning Bidder prior to Contract execution. Schedule Requirements (Base Bid): Contractor will renovate two cottages, in sequence. The cottages will be unoccupied during renovation. Following substantial completion and Owner's occupation of the first cottage, Owner will direct Contractor to renovate the second Cottage. Schedule Requirements (Alternate): Substantial completion and Owner's occupation of Cottages #1 and #2, Owner will direct Contractor to renovate a third unoccupied cottage as designated by Owner. Completion dates are listed below. FIRST COTTAGE SUBSTANTIAL COMPLETION: 184 calendar days from issuance of Notice to Proceed SECOND COTTAGE SUBSTANTIAL COMPLETION 368 calendar days from issuance of Notice to Proceed THIRD COTTAGE SUBSTANTIAL COMPLETION (if Alternate is included in Contract): 552 calendar days from issuance of Notice to Proceed FINAL COMPLETION (if Contract includes Base Bid Only): 428 calendar days from issuance of Notice to Proceed FINAL COMPLETION (if Contract includes Base Bid Plus Alternate): 642 calendar days from issuance of Notice to Proceed LIQUIDATED DAMAGES: Liquidated damages of$500.00 will apply to the contract resulting from this ITB. (See Exhibit 5 for detailed information) PROJECT DESCRIPTION: The Work of Project is defined by the Contract Documents and generally consists of the following: Base Bid: Architectural, Structural, HVAC, Plumbing and Electrical renovation to two existing one story, 5,500 square foot juvenile housing facilities (Crater and Fossil Cottages) located within a secure campus. Alternate Bid (if selected by Owner): Architectural, Structural, HVAC, Plumbing and Electrical renovation to one existing one story, 5,500 square foot juvenile housing facility (Haystack Cottage) located within a secure campus. The Work is Phase 3 of a Phased Construction Project. Phase 1 (complete) involved installation of electrical and telecommunications infrastructure to serve future building renovation projects. Phase 2 (complete) involved the renovation of two Cottages. Phase 3 (Base Bid) involves the renovation of two unoccupied Cottages (Crater and Fossil), in sequence as designated by the Owner. Once the first Cottage is complete and occupied by the Owner, Contractor renovate the second Cottage. If Owner has selected the Alternate, upon Substantial Completion of the first two Cottages, and occupied by Youth, Contractor will renovate a third Cottage (Haystack).
Award
Jails / Prisons
$6,678,951.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 4, 2021
July 5, 2021
2630 N Pacific Hwy, Woodburn, OR
Related To This Project
Woodburn, OR
Bid Date: Jul 09 2024
Woodburn, OR
Bid Date: Aug 23 2022
Woodburn, OR
--
Woodburn, OR
--
Woodburn, OR
Bid Date: Jan 23 2023
Woodburn, OR
Bid Date: Feb 16 2023
Woodburn, OR
Bid Date: Mar 30 2023
Woodburn, OR
Bid Date: Aug 16 2022
Woodburn, OR
Bid Date: Aug 04 2022
Woodburn, OR
Bid Date: Aug 26 2022
Woodburn, OR
Bid Date: Aug 17 2022
Woodburn, OR
--
Woodburn, OR
Bid Date: Jul 22 2022
Woodburn, OR
Bid Date: Jun 16 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Find better projects. Build better bids. Win.
Sign up for instant access to Project Search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.