BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Hot Springs, Arkansas. Working plans call for site work for a road / highway; for paving for a road / highway; water / sewer project; bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

https://www.hotsr.com/news/2022/sep/30/watch-ardot-director-gives-update-on-road-projects/ - The 1.5-mile widening of Highway 270 west from the Highway 227 junction to Fleetwood Drive is scheduled to be completed by late next year. The $23 million project funded by the state's 0.50% sales tax is building four travel lanes, a turn lane and bike lanes. The segment from the expressway to Highway 227 will also be resurfaced. The widening was initially programmed to extend west to the Lake Hamilton bridge. Tudor said ArDOT plans to take bids on the 1.7-mile project in 2024. _____________________________________________________________________________________________ As per the Owner the project has been Withdrawn. Editorial Content Team is actively seeking updated information. The Purpose of This Project Is to Widen Approximately 1.745 Miles of Highway 270 in Garland County. This Project Consists of Removal and Disposal Items, Earthwork, Aggregate Base Course, Achm Binder And Surface Courses, Achm Patching of Existing Roadway, Maintenance of Traffic, Minor Drainage Structures, Erosion Control Items, Concrete Walks, Curb and Gutter, Traffic Signal Items, Pavement Marking, One Triple R.c. Box Culvert (Total Span 20.33'), and Misc. Items. Federal Aid Project 9991 Routes: 270 Sections: 5 County: Garland Length: 1.745 Miles in Length. This Proposal Contains the Job Special Provision "site Use (a+c Method)-calendar Day Contract" for Bidding in Which the Bidder Will Determine the Number of Calendar Days to Complete the Project. Questions pertaining to projects during the advertisement period should be addressed to the Program Management Division at pmd@ardot.gov. The deadline to submit a question is the Wednesday prior to the scheduled letting date. A question submitted after the close of business on the Wednesday prior to the scheduled letting date may not receive a response. In order to have a bid considered, contractors must furnish a proposal guaranty consisting of either abidder's bond or a certified or cashier's check in the amount of five percent (5%) of the total amount bid. In order for a bond to be acceptable to the Department, the company issuing the bond must be named in the Department of Treasury Listing of companies holding Certificates of Authority as acceptable sureties on Federal Bonds and as acceptable reinsuring companies. The Underwriting Limitation of the bonding company shall be adhered to. Any excess (between the face amount of the Bond and the Underwriting Limitation) shall be protected by reinsurance provided by an acceptable reinsuring company. These contracts are subject to normal prequalification, licensing and bonding requirements, applicablelabor laws, non-discrimination provisions, wage rate laws and other Federal laws including the Fair Labor Standards Acts of 1938. The Work Hours Act of 1962 and Title VI of the Civil Rights Act of 1964 also apply. The Arkansas Department of Transportation complies with all civil rights provisions of federal statutes and related authorities that prohibited discrimination in programs and activities receiving federal financialassistance. Therefore, the Department does not discriminate on the basis of race, sex, color, age, national origin, religion, or disability, in the admission, access to and treatment in Department's programs and activities, as well as the Department's hiring or employment practices. Complaints of alleged discrimination and inquiries regarding the Department's nondiscrimination policies may be directed to Joanna P. McFadden, Section Head - EEO/DBE (ADA/504/Title VI Coordinator), P. O. Box 2261, Little Rock, AR 72203, (501) 569-2298, (Voice/TTY 711), or the following email address: joanna.mcfadden@ardot.gov. The successful bidder will be required to complete this contract within fifty (35) working days. Federal aid project ACSTPR-0073(78) The Department reserves the right to reject any or all bids and to waive any formalities. AR DOT - Hwy. 1b Str. And Apprs. (S)

Final Planning

Roads / Highways

$22,614,577.00

Public - State/Provincial

Paving, Site Work

281

4

2

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
88
Active Projects
59
Bidding Soon
593
All Active Projects
258
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 7, 2021

September 14, 2023

December 31, 2024

img_map_placeholder

US-270, Hot Springs, AR

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.