BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and renovation of a mixed-use development in Milpitas, California. Completed plans call civil work for a municipal facility and water / sewer project.

Project Description. The Project is being constructed to extend the life cycle of the existing facility by preventing the concrete walls from further deteriorating and to maintain the as-built channel flood capacity. Post-construction, the facility would have approximately more than 15 years sustainability before a full replacement of the facility is required. The scope includes the following: 1. Compliance with Stream Maintenance Program 2 (SMP2) Permits and installation of BMP's. 2. Control of water, including but not limited to; dewatering system, pumps,force mains, and proper diversion of upstream drainage and channel flows; proper handling and disposal of groundwater flows that are by products of the required construction; water quality, sampling, monitoring, and reporting per the SMP2 permits requirements; proper handling and diversion of storm drain runoff from outfalls. 3. Clearing and grubbing within the Project limits. 4. Photographic and video documentation, pre-construction survey photos and videos. 5. Site, noise and vibration monitoring. 6. Establishment and maintenance of construction staging areas. 7. Working adjacent to, delineating of and demarcation of existing bridges, residential and commercial structures, utility facilities (including overhead utility lines, etc.). 8. Removal of steel structures and pertinent materials, as identified in the Contract Plans. 9. Installation of all steel AISC structural sections, Structural steel welding by qualified and certified welders, epoxy anchors, structures and other pertinent steel materials, as described in the Specifications and Contract Plans. 10. Other miscellaneous construction activities and items necessary to satisfactorily complete the Work. The estimated cost of the Project is $3.1 million to $3.3 million.

Award

Water / Sewer

$2,641,800.00

Public - County

Renovation, Site Work

Subscribe For Documents

65 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
75
Bidding Soon
1,559
All Active Projects
674
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2021

June 21, 2021

img_map_placeholder

To Be Determined, Milpitas, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.