BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 15, 2021 at 8:00 PM

Updated September 27, 2025

Site work and paving for a bridge / tunnel in Jefferson City, Missouri. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

As of March 15, 2021, a general contractor has been awarded. An estimated timeline of end of March has been released. All trades are let. The project will will extend the lives of both bridges. The westbound bridge rehabilitation will consist of repairing all the bridge piers, while the eastbound bridge rehabilitation will consist of repairing the deck, expansion joints and piers, and applying an overlay to the driving surface.

Award

Bridges / Tunnels

$4,125,000.00

Public - State/Provincial

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
51
Bidding Soon
462
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2021

Project location map

Multiple Locations, Jefferson City, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.