BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 14, 2021 at 8:00 PM

Updated November 14, 2023

Site work and paving for a mixed-use development in St Clair Shrs, Michigan. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The proposed project consists of reconstructing the existing parking lot for Kyte Monroe Park. The project involves the removal of existing HMA and base, construction of new HMA parking lot with curb and gutter. All questions shall be directed to Troy J. Nuccio, P.E. by email at tjnuccio@hengineers.com. All questions must be submitted by minimum five (5) business days prior to Tuesday, April 13th.

Bid Results

Sidewalks / Parking Lot

$507,133.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
337
Active Projects
184
Bidding Soon
2,521
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 13, 2021

September 7, 2021

Project location map

32701 Harper Ave, St Clair Shrs, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.