BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 20, 2021 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Dallas, Texas. Completed plans call for site work for a water / sewer project.

Estimated Cost; Between $750,000 - $1,250,000 Lift station project scope shall include the Lift Station Improvements, as per NCTCOG, Construction Plans, and City of Dallas specifications. The project is located North and East of the intersection of Bobtown Rd. and Barnes Bridge Rd. in City of Dallas ETJ, Dallas County, Texas. Utility project scope shall include the Utility Improvements, approximately 16,361 LF of 16-8 water, 16,034 LF of 15 to 8 gravity sewer, 7,256 LF of 10 and 6 force main pipe, and 7,095 LF of 6x3 RCB through 21 RCP storm sewer, all as per NCTCOG, Construction Plans, and City of Dallas specifications to serve 148 lots on approximately 49 acres. The project is located North and East of the intersection of Bobtown Rd. and Barnes Bridge Rd. in City of Dallas ETJ, Dallas County, Texas. Paving project scope shall include the Paving Improvements, consisting of approximately 46,858 SY of 6-4000 psi concrete street pavement on approximately 49,264 SY of 7 lime stabilized subgrade, 1,976 SY of asphalt pavement on approximately 2,152 SY of 6 lime and cement stabilized subgrade, and 3,009 SY of 8-5-8-4000 psi concrete alley pavement on approximately 3,548 SY of 8 lime and cement stabilized subgrade, all as per NCTCOG, Construction Plans, City of Dallas, and City of Garland specifications to serve 148 lots on approximately 49 acres. The project is located North and East of the intersection of Bobtown Rd. and Barnes Bridge Rd. in City of Dallas ETJ, Dallas County, Texas. The above-described construction will be performed in accordance with plans and specifications and any addenda thereto which may be issued prior to the opening of bids. Each Bid must be accompanied by a Certified or Cashiers Check, from a responsible bank in the State of Texas, or a Bid Bond, issued by a surety legally authorized to do business in the State of Texas, equal to five percent (5%) of the total bid amount. Make the Cashiers Check, Certified Check or Bid Bond payable to the Owner. The Owner reserves the right to reject any or all bids or to accept any bid deemed advantageous to it and waive informalities in bidding. All bids received after the abovedesignated closing times will be returned unopened.

Bid Results

Water / Sewer

$985,050.00

Public - County

Site Work

Subscribe For Documents

92 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
402
Active Projects
146
Bidding Soon
4,153
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2021

May 17, 2021

Project location map

Bobtown Rd & Barnes Bridge Rd, Dallas, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.