Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and outdoor lighting for a mixed-use development in Manti, Utah. Completed plans call for site work for a transportation facility; for outdoor lighting for a transportation facility; and for paving for a transportation facility.
The work involved will include the following: Schedule I - Construct Runway 3 Taxiway Turnaround The major items involved in the proposed work are: excavation, subgrade preparation, subbase course, base course, asphalt, pavement markings, storm drain pipe, underdrain, catch basin, and airfield lighting. Construction for this project is expected to take 20 Working Day(s). For additional information, please contact us via email at bid.info@woolpert.com. Note that contractors will NOT be automatically added to new projects. You will need to re-submit the online form for access to new projects. Once granted access, additional projects will use your same login credentials. Note: Plan ahead when submitting the online request form and allow up to 2 business days for approval and access to projects. Bid Conditions. The bidder is required to provide all information as required within the Contract Documents. The bidder is required to bid on all items of every schedule or as otherwise detailed in the Instructions to Bidders. Bids may be held by Ephraim City for a period not to exceed 150 calendar days from the date of the bid opening for the purpose of evaluating bids prior to award of contract. All questions regarding the bid are to be directed to Kirt McDaniel with Jviation, a Woolpert Company, 35 South 400 West., Suite 200, St. George, Utah, 84770, (435) 574-5308, Fax: (435) 673-8484, or email kirt.mcdaniel@woolpert.com. Bid Bond. Guarantee will be required with each bid as a certified check on a solvent bank or a Bid Bond in the amount of five (5) % of the total amount of the bid, made payable to the Ephraim City. Performance & Payment Bond. The successful bidder will be required to furnish separate performance and payment bonds each in an amount equal to 100% of the contract price. Airport and Airway Improvement Act of 1982 as Amended. In accordance with the Davis-Bacon Act, as amended, the Contractor will be required to comply with the wage and labor requirements and to pay minimum wages in accordance with the schedule of wage rates established by the United States Department of Labor. Equal Employment Opportunity and Affirmative Action Requirement. The proposed contract is under and subject to 41 CFR Part 60-4 and Executive Order 11246 of September 24, 1965, as amended, and to the equal opportunity clause and the Standard Federal Equal Employment Opportunity Construction Contract specifications including the goals and timetables for minority and female participation. Regulations, hereby notifies all bidders or offerors that it will affirmatively ensure that any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full and fair opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. DBE Requirement. The requirements of 49 CFR part 26 apply to this contract. It is the policy of Ephraim City to practice nondiscrimination based on race, color, sex, or national origin in the award or performance of this contract. The Owner encourages participation by all firms qualifying under this solicitation regardless of business size or ownership. The Manti-Ephraim Airport has a DBE participation goal to be obtained through race/gender-neutral means of 5.29%. Contractor shall provide a certified statement signed by the subcontractors, indicating actual amounts paid to the Disadvantaged Business Enterprise (DBE) subcontractors and/or suppliers that were used on the project through race neutral means. Buy American Preference. The Contractor agrees to comply with 49 USC 50101, which provides that Federal funds may not be obligated unless all steel and manufactured goods used in AIP funded projects are produced in the United States, unless the Federal Aviation Administration has issued a waiver for the product; the product is listed as an Excepted Article, Material Or Supply in Federal Acquisition Regulation subpart 25.108; or is included in the FAA Nationwide Buy American Waivers Issued list. A bidder or offeror must complete and submit the Buy America certification included herein with their bid or offer. The Owner will reject as nonresponsive any bid or offer that does not include a completed Certificate of Buy American Compliance. Certification of Offeror/Bidder Regarding Debarment. By submitting a bid/proposal under this solicitation, the bidder or offeror certifies that neither it nor its principals are presently debarred or suspended by any Federal department or agency from participation in this transaction. Other Federal Provisions. Award of contract is also subject to the following Federal Provisions: * Trade Restriction Certification * Lobbying Federal Employees * Recovered Materials * Government-wide Requirements for Drug-free Workplace * Other Federal Provisions included in Part A of the Special Provisions The right is reserved, as Ephraim City may require, to reject any and all bids and to waive any informality in the bids received.
Bid Results
Transportation Terminals
$462,894.00
Public - County
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 15, 2021
May 14, 2021
Airport Rd, Manti, UT
Related To This Project
Manti, UT
Bid Date: Mar 21 2023
Manti, UT
Bid Date: Jun 29 2023
Manti, UT
Bid Date: Apr 27 2023
Manti, UT
Bid Date: Sep 02 2020
Manti, UT
Bid Date: Aug 11 2023
Manti, UT
Bid Date: Sep 18 2023
Manti, UT
Bid Date: Sep 27 2019
Manti, UT
--
Manti, UT
Bid Date: May 05 2022
Manti, UT
Bid Date: Nov 10 2022
Kanab, UT
Bid Date: May 05 2022
Salina, UT
Bid Date: Mar 07 2022
Richfield, UT
Bid Date: Apr 21 2022
Elsinore, UT
Bid Date: May 11 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.