Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a mixed-use development in Carson, California. Working plans call for the renovation of a educational facility; and library.
**As of 9/9/2021 This project has not yet been awarded . The Trustees of The California State University are requesting Statements of Qualifications (SOQ) from interested and qualified design-builders (Respondents) to design and build the above-named Project. The Trustees will select a design-build team consisting of a general contractor and architect (Design-Builder) using a two-step process: (1) this Request for Qualifications (RFQ) from which Respondents may submit SOQ to the Trustees, and (2) the Request for Proposals (RFP) which the Trustees will issue to the shortlisted firms. In general, the scope of work consists of the design and construction, under a procedure more commonly referred to as turnkey construction, of a Building Fire Safety System Upgrades, for the Cain Library as base bid and SBS Building Fire System Upgrades as alternate. The Project includes: The project consists of providing fire sprinklers and fire protection systems in one existing building in the base bid scope of work, namely, the Leo F. Cain Library. The Social and Behavior Sciences (SBS) building, will be an alternate, for pricing purposes. The Cain Library is a five-story building built in 1972 and of noncombustible (concrete construction. The building has faculty offices, conference rooms, classrooms, and some student services. The alternative is the SBS building, a three-story building built in 1972, of noncombustible (concrete) construction. The building has classrooms, labs, and faculty offices In the base Bid, the Cain Library shall be provided with a new multiplex, fully addressable fire alarm and detection system including an emergency voice/alarm communication system. The SBS building will be provided with a system as an alternate. Contractor License Requirement: B Direct any prequalification questions to the Trustees' Prequalification Administrator at cocm.prequal@calstate.edu.
Final Planning
Library
$1,500,000.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 23, 2021
December 23, 2021
Multiple Locations, Carson, CA
Related To This Project
Carson, CA
--
Carson, CA
--
Carson, CA
Bid Date: Feb 23 2022
Carson, CA
Bid Date: Mar 03 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.