BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Madera, California. Design plans call for site work for a water / sewer project.

Per the owner, as of May 4, 2022, an award has been made for this solicitation. The owner states that construction is not expected to begin for at least another 2-3 years. Closed solicitation has been included below for reference. ……………….. The intent of this RFQ/RFP is to engage a professional engineering consultant, through the Qualifications Based Selection (QBS process, to produce a planning design study, which includes, among other things, preparing a feasibility study, evaluating alternatives, and preparing final plans and specifications for construction of the water system improvements. The intent of this Request for Qualifications & Request for Proposals (RFQ/RFP) is to engage a professional engineering consultant, through the Qualifications Based Selection (QBS process, to produce a planning design study, which includes, among other things, preparing a feasibility study, evaluating alternatives, and preparing final plans and specifications for construction of the water system improvements. The project will be required to meet California safe Drinking Water Standards and comply with the State funding requirements. On April 1, 2019 Madera County Environmental Health Division (Division) issued a water system compliance order for 1,2,3-Trichloropropane (1,2,3-TCP) maximum contaminant level violation. Per directive 1 of the order, MD-28 is to take action to bring the water system into compliance with pertinent Title 22 regulations. Additionally, the County Public Works Department has been working with the Division to improve the MD-28 water system. Potential improvements include but are not limited to a new water source, water distribution pipelines, water treatment, and water storage. Consolidation with nearby water systems including the nearby businesses, elementary school, and out of district homes are also a point of interest for the Division. The goal of the County is to improve the security and reliability of the MD-28 drinking water system Deadline for Proposer Written Questions March 31, 2021 County Responses to Written Questions April 5, 2021 Please direct all correspondence or inquiries to: Ramon E Mendez, P.E. Engineer III Tel (559) 675-7811 Fax (559) 675-7631 ramon.mendez@maderacounty.com

Design

Water / Sewer

$8,000,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
50
Active Projects
35
Bidding Soon
475
All Active Projects
210
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2024

img_map_placeholder

Multiple Locations, Madera, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.