Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a civil project in Mound City, Kansas. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
Bids for the construction of the Water Distribution System Improvements will be received by Linn Co. RWD No. 2 at the District office, 523 Main St., Mound City, KS_ until 3:00 p.m. local time on Thursday, April 22 2021, at which time the Bids received will be publicly opened and read. The Project consists of the following contracts: Contract 1: Waterline Contract 2: 50,000 Gallon Elevated Storage Tank Bid security shall be furnished in accordance with the Instructions to Bidders. All Bids must be filed in said office on or before the time herein set, on forms furnished by the Owner, and must be enclosed in a separate sealed envelope and plainly identified. Each Bid shall be accompanied by a Bid Bond, certified check, cashier's check, or certified credit union share draft in a separate sealed envelope in an amount equal to five per cent (5%) of the total amount of the Bid. If Bid Bond is submitted, it must be on the form provided with the Contract Documents. The certified check, cashier's check, or certified credit union share draft shall be drawn on a bank in the state of the Owner, a bank chartered under the laws of the United States of America, or said certified share draft shall be drawn on a credit union in the state of the Owner, or chartered under the laws of the United States, and payable to the Treasurer of the Owner as security that if awarded a contract, the Bidder will enter into a contract at the prices Bid and furnish the required Performance and Payment Bonds in the amount of one hundred per cent (100%) of the Work and Certificate of Insurance. The certified check, cashier's check, or certified share draft may be cashed, or the Bid Bond forfeited, and the proceeds retained as liquidated damages if the Bidder fails to execute a contract or file acceptable Performance and Payment Bonds or provide an acceptable Certificate of Insurance within fifteen (15) days after the acceptance of said Bid by resolution of the Owner. No Bidder may withdraw a Bid within sixty (60) days after the date set for opening Bid. Contractor will be required to comply with the President's Executive Order 11246, as amended, which requires the Contractor to take steps to meet aggregate workforce goals of 5.7% for minority participation and 6.9% for female participation. Requirements for bidders and contractors under this order are explained in the Rural Development portion of these specifications. Bidders on this work will be required to comply with the requirements of OMB Circular A-102, "Standards Governing State and Local Grantee Procurement". Particular attention is directed to the requirements for affirmative steps to be taken in the solicitation of Minority Business Enterprises and Woman's and Disadvantaged Business Enterprises by the Contractor in procuring subcontractors for this Contract. The prospective Bidders must certify by submittal of USDA Form AD-1048 "Certification Regarding Debarment, Suspension, Ineligibility and Voluntary Exclusion - Lower Tier Covered Transactions" that, to the best of its knowledge and belief, it and its principals are not presently debarred, suspended, proposed for debarment, declared ineligible or voluntarily excluded from covered transactions by any federal department or agency. The prospective Bidders must complete RD Instruction 1940-Q, Exhibit A-1, "Certification for Contracts, Grants and Loans". Section 746 of Title VII of the Consolidated Appropriations Act of 2017 (Division A - Agriculture, Rural Development, Food and Drug Administration, and Related Agencies Appropriations Act, 2017) and subsequent statutes mandating domestic preference applies an American Iron and Steel requirement to this project. All listed iron and steel products used in this project must be produced in the United States. The term "iron and steel products" means the following products made primarily of iron or steel: lined or unlined pipes and fittings, manhole covers and other municipal castings, hydrants, tanks, flanges, pipe clamps and restraints, valves, structural steel, reinforced precast concrete, and construction materials. The deminimis and minor components waiver {add project specific waivers as applicable} apply to this contract. Bids received will be acted upon by the Owner at the time and place above specified or at such later time and place as may then be fixed. The Owner hereby reserves the right to reject any or all Bids, to waive informalities and irregularities and to enter into such contracts as it may deem to be for the best interests of the Owner. Contract 1: Waterline -- $750,000 - $1,000,000 Contract 2: Water Tower -- $500,000 - $700,000
Post-Bid
Water / Sewer
$900,000.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 29, 2021
August 30, 2021
Multiple Locations, Mound City, KS
Related To This Project
Mound City, KS
Bid Date: Mar 15 2023
Mound City, KS
Bid Date: Dec 15 2021
Mound City, KS
Bid Date: Dec 15 2021
Mound City, KS
Bid Date: Dec 13 2023
Mound City, KS
Bid Date: Feb 09 2024
Mound City, KS
Bid Date: Mar 15 2024
Mound City, KS
Bid Date: Apr 17 2024
Mound City, KS
Bid Date: Dec 11 2024
Mound City, KS
Bid Date: Apr 18 2022
Mound City, KS
Bid Date: Feb 19 2020
Mound City, KS
Bid Date: Apr 18 2022
Mound City, KS
Bid Date: Apr 15 2022
Mound City, KS
Bid Date: Apr 15 2022
Hugoton, KS
Bid Date: Oct 28 2021
Topeka, KS
Bid Date: Sep 08 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.