BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Loveland, Colorado. Completed plans call for site work for a bridge / tunnel; for outdoor lighting for a bridge / tunnel; for paving for a bridge / tunnel; playground / park / athletic field; playground / park / athletic field; playground / park / athletic field; road / highway; road / highway; road / highway; water / sewer project; water / sewer project; and water / sewer project.

For Landscape Improvements For the construction of the Kinston Phase 1 Public Landscape Improvements project. The project generally includes irrigation, landscaping, traffic control, entry signs, bridge enhancements, retaining walls, stacked stone walls, stone columns, timber posts, site furniture, playground equipment, site lighting and all related work incidental to the completion of the project as per the acceptance requirements of Kinston Metropolitan District No. 1 and City of Loveland. The project is located in the vicinity of Kendall Parkway and Centerra Parkway in Loveland, CO. Work is anticipated to start June 1, 2021. A bid bond in the amount of five percent (5%) of the total bid is required with each bid. Performance and payment bonds will be required of the successful bidder from a qualified surety. Bidders must possess the required licenses and insurance policies. Each bid must be accompanied by a qualification statement demonstrating present commitments, past performance, experience with comparable work, equipment available for this project, and resumes for key personnel who would be assigned to this project. No bid will be accepted from any firm, person, or corporation who is a defaulter to a surety or is deemed incompetent, irresponsible, or unreliable by the District. Each bid must be accompanied by a subcontractor and supplier list for proposed labor, services, and/or materials. Bidding contractors must self-perform a minimum of twenty percent (20%) of the work. The District may choose to schedule interviews with select bidders following the bid opening. Basis of the award of the contract will be to the lowest responsible and responsive bidder as solely determined by the District. The District reserves the right to reject any and all bids or to accept any bid or combination of bids which in its sole and absolute judgment will best serve the District's interest. Prebid info -Joining by phone 1-408-418-9388 United States Toll Access code: 182 081 0153 The project generally includes irrigation, landscaping, traffic control, entry signs, bridge enhancements, retaining walls, stacked stone walls, stone columns, timber posts, site furniture, playground equipment, site lighting and all related work incidental to the completion of the project as per the acceptance requirements of Kinston Metropolitan District No. 1 and City of Loveland. The project is located in the vicinity of Kendall Parkway and Centerra Parkway in Loveland, CO. Work is anticipated to start June 1, 2021

Post-Bid

Bridges / Tunnels

$750,000.00

Public - City

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
192
Active Projects
109
Bidding Soon
1,601
All Active Projects
678
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 23, 2021

June 1, 2021

November 30, 2021

img_map_placeholder

Kendall Parkway and Centerra Parkway, Loveland, CO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.