Published May 14, 2021 at 8:00 PM

Updated October 1, 2024

Site work and renovation of a water / sewer project in Corning, New York. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

For Wastewater Treatment Facility (WWTF) Improvements - Contract B: Chemical Storage Building - Electrical Construction The Project consists of constructing Wastewater Treatment Facility Improvements and includes the following: Contract B: Chemical Storage Building involves the general construction of new treatment components including a new chemical feed system. The work also includessitework including piping modifications and expansion, surface restoration, etc. The electrical construction consists of all electrical power connections including the installation of electric conduit, panels, disconnects and wiring for all new process equipment, and lighting systems serving the new treatment components. Separate bids for the General Construction and Electrical Construction will be taken on Contract B. Minority and Women's Business Enterprises are encouraged to apply. Contract Award will also emphasize MWBE participation in accordance with New York State Executive Law Article 15-A and 5 NYCRR Parts 142-144 ("MWBE Regulations") Bid security shall be furnished in accordance with the Instructions to Bidders. Each bid must be accompanied by a certified bank check or bid bond from a domestic carrier licensed to do business in the State of New York in the amount of not less than five (5%) of the amount of the bid submitted. Only written Requests For Information (RFI) will be accepted. RFI's will be accepted until 12:00 p.m. (Local Time) on April 7, 2021 at the office of the Engineer to the attention of David Hardenbrook via email: DHardenbrook@CPLteam.com. If necessary, an Addendum will be issued by 5:00 p.m. (Local Time) on April 9, 2021 from the office of the Engineer. Bidders on this work will be required to comply with the President's ExecutiveOrder Nos. 11,246 and 11,375 which prohibit discrimination in employment regarding race, creed, color, sex, or national origin. The successful bidder must be an equal opportunity employer, must meet all appropriate State and Federal standards, and comply with all relevant governmental regulations. This project is funded by New York State Department of Environmental Conservation (NYSDEC). Prospective bidders should review funding agency requirements included in the Contract Documents. Statement of Non-Collusion: Bidders on the contract are required to execute a non-collusive bidding certificate pursuant to Section 103d of the General Municipal Law of the State of New York. Security for Faithful Performance: The successful bidder will be required to furnish Performance and Labor and Material Payment Bonds written by firmslicensed to do businessin New York State, each in the amount of one hundred percent (100%) of the contract amounts in accordance with the provisions of the Contract Documents. Sales and Use of Tax Exemptions: The City of Corning is exempt from the payment of sales and compensation use taxes of the State of New York and of cities and counties on all materials, equipment, and supplies sold to the City of Corning pursuant to this contract. Also exempt from such taxes are purchases by the Contractor and his Subcontractors of materials, equipment, and supplies to be sold to the City of Corning pursuant to this contract, including tangible personal property to be incorporated in any structure, building, or other real property forming part of the project. These taxes are not to be included in the Bid. All bids shall be binding for a period of forty-five (45) days after the bid opening date. The City of Corning reserves the right to reject any and all bids and to waive any informalities therein.

Award

Water / Sewer

$600,000.00

Public - City

Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Controls, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete, Maintenance of Concrete, Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Specialty Placed Concrete, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Brick Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Metal Fabrications, Metal Gratings, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Flashing and Sheet Metal, Sheet Metal Flashing and Trim, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Wood Doors, Specialty Doors and Frames, Panel Doors, Hardware, Door Hardware, Glazing
Division 09 - Finishes

Division 09 - Finishes

Ceilings, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps, Bedroom Furnishings, Blankets, Furniture, Seating, Chairs
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 26 - Electrical

Division 26 - Electrical

Low-Voltage Electrical Distribution, Lighting, Interior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Geotextiles for Earthwork, Earth Moving, Grading, Fine Grading, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Shoring and Underpinning, Shoring, Sheet Piling, Special Foundations and Load-Bearing Elements, Special Foundations, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding, Plants, Ground Covers, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Storage Tanks, Storm Drainage Utilities, Culverts, Subdrainage
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration, Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers
Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Division 43 - Process Gas and Liquid Handling, Purification and Storage Equipment

Liquid Handling Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
106
Bidding Soon
1,183
All Active Projects
472
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 13, 2021

May 13, 2021

img_map_placeholder

Trolley Ln, Corning, NY

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Wastewater Treatment Facility Improvements - Contract B: Chemical Storage Building - Electrical Construction

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.