BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Sauk Rapids, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Project Major Items: Number Item Units Quantity 18- to 51-Inch RC Pipe 144 0.00 6-Inch Concrete Walk 310 0.00 Aggregate Base (CV) Class 5 (P) 973 0.00 Bituminous Patch Special 94 0.00 Common Excavation (P) 1,315 0.00 Crosswalk Multi-Component 270 0.00 Geotextile Fabric Type V 3,900 0.00 Grubbing 0.4 0.00 Grubbing 25 0.00 Muck Excavation 1,660 0.00 Residential Seeding 0.85 0.00 Select Granular Borrow (LV) 3,829 0.00 Type SP 9.5 Wearing Course Mixture (2,C) 440 0.00 Wire Fence Design 60V-9322 200 0.00 Expected Award Date: 04/26/2021 Highest Funding Level: Federal DBE Project: Yes Minimum wage rates to be paid by the Contractors have been predetermined and are subject to the Work Hours Act of 1962, P.L. 87-581 and implementing regulations. A minimum goal of 6.7 % Good Faith Effort to be subcontracted to Disadvantaged Business Enterprises. Bid security in the amount of 5 percent of the Bid must accompany each Bid in accordance with the Instructions to Bidders. Bid security may be retained until the contract has been awarded and executed, but not longer than 60 calendar days from the date of opening bids. No bidder may withdraw their bid for a period of 60 calendar days after the bid opening. A Contractor responding to these Bidding Documents must submit to the City/Owner a signed statement under oath by an owner or officer verifying compliance with each of the minimum criteria in Minnesota Statutes, section 16C.285, subdivision 3. The Owner reserves the right to reject any and all Bids, to waive irregularities and informalities therein and to award the Contract in the best interests of the Owner. STATE PROJECT NO. 191-090-002 The Contractor must immediately notify the Engineer of any site visits by Local Permitting Authorities performed in accordance with Section 24.10 of the permit. The Contractor must obtain the Engineers approval before starting any work required by regulatory authorities which (1) the Contractor believes will result in additional compensation from City of Sauk Rapids; or (2) will impact the design or requirements of the Contract documents or impact traffic.

Award

Roads / Highways

$318,660.00

Public - City

Paving, Site Work

31

8

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
43
Bidding Soon
731
All Active Projects
327
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2021

June 7, 2021

img_map_placeholder

Multiple Locations, Sauk Rapids, MN


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.