Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 1, 2022 at 7:00 PM

Updated November 15, 2023

Site work and new construction of a library in Clifton, Colorado. Working plans call for the construction of a library; and for site work for a library.

As of March 1, 2022, a construction manager at risk firm has been selected and this project is in the pre-construction/negotiated status. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: As of 6/17/21: Awarded bidder will be available on 7/15/21. Purchase Type Duration: Commence June 28, 2021 Option: TBD Question Acceptance Deadline 05/05/2021 07:00 PM EDT Questions are submitted online No Mesa County Public Library District (MCPLD) is inviting and requesting proposals for Construction Manager at Risk Services for the construction of the Clifton Capital Project. The planned construction of a new library building will have approximately 21,000 square feet of interior space with parking facilities on the northern portion of the site (see Exhibit C). Preliminary project estimates have fallen between $8.2 million to $11.6 million, thus the District is targeting the overall project budget to be $8.5 million. The Board intends to engage a Construction Manager At-Risk (CMAR) which will work with the Mesa County Public Library Board of Trustees, the Architect, and MCPLD staff to help develop a Building Program and Construction Project which incorporates prioritized needs within budgeted funds. General Requirements - Insurance Required Award Requirements - All or None Award *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The method of Contractor Selection has not been Determined at this time. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Pre-Construction/Negotiated

Library

$8,500,000.00

Public - County

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 21, 2021

May 20, 2022

Project location map

To Be Determined, Clifton, CO

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed