BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Farmington Hills, Michigan. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

As of February 9, 2022, information regarding award and award has not been disclosed. A firm timeline for construction has not been disclosed. *The closed solicitation has been included below for reference: The City of Muskegon is seeking proposals from interested consulting engineers to provide full survey, design and construction project services related to expansion of the existing road network within the Port City Industrial Park. The City of Muskegon has acquired through purchase a large addition to the industrial park and is seeking to construct an access road to service the new addition to the park. The City of Muskegon has appropriated a maximum of $750,000 towards completion of the access road project. Work by the selected engineer will include the following: Survey of the entirety of the site to establish site features, topography and boundaries Geotechnical or other investigations as needed to support design Design of an access road in accordance with City Standards along the approximate route Design of utility service for the site both public and coordination with private utilities Development and refinement of conceptual layouts for streets and utilities Development of complete plans and specifications for the access route and public utilities Obtaining any necessary permits for the project Assistance in solicitation of bids for the construction of the access road and utilities Oversight and administration of the construction contract on behalf of the city Prepare final property boundaries including remaining parcels, road right-of-way and any utility easements for the entire site. Several supporting documents are included and attachments to this RFP to help in the development of proposals and for use during the later project phases: Attachment A - Aerial Map of Site Showing Utility Location Attachment B - Utility As-Builts for the vicinity Attachment C - Approximate Route of Access Road Additional Design Considerations: Consideration will also need to be given to private utilities and their means of serving the future site. Engineer shall be responsible to coordinate and account for private utility needs in the project design. The city will be undertaking a separate project to have the site largely cleared of trees prior to the construction project. The southern portion of the project is owned by the City but is located within Fruitport Charter Township. City of Muskegon will host site meetings upon request to answer questions and review the project site. Requests submitted to Leo Evans via email (Leo.Evans@shorelinecity.com) prior to Monday, April 5th 2021 will be accommodated prior to the bid opening. Requests received after that date will be accommodated pending staff availability. Subcontractors, if any, shall be approved by the Project Manager prior to acceptance on this contract and shall bound by these specifications. It is the responsibility and duty of the contractor to verify that the subcontractor meets all conditions. The contractor shall furnish any subcontractor's proof of insurance meeting city requirements. Construction shall be per applicable industry and City of Muskegon standards and shall comply with all applicable City of Muskegon policies and procedures. The City reserves the right to reject any and all proposals and to waive any irregularity in proposals received whenever such rejection or waiver is in the best interest of the City. The bidder to whom the award is made will be notified at the earliest possible date. All bidders submitting proposals will be notified when the award is made. Award will follow the current purchasing policies and any other applicable guidelines for the City of Muskegon. The Award will not be completed until confirmed and recommended by the City Commission. The method of contractor selection has not been determined at this time.

Conceptual

Roads / Highways

$2,000,000.00

Public - City

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
156
Active Projects
76
Bidding Soon
1,396
All Active Projects
553
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2022

img_map_placeholder

Industrial Park Dr, Farmington Hills, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.