Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a transportation facility in Worcester, Massachusetts. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.
The work includes: pavement milling, hot mix asphalt paving, crack repairs, light fixture installation, electric handhole and duct banks, airfield guidance signs, topsoiling and seeding, and pavement markings. The estimated contract cost is TWO MILLION SIX HUNDRED THOUSAND DOLLARS ($2,600,000.00). A proposal guaranty shall be submitted with each General Bid consisting of a bid deposit for five (5) percent of the value of the bid; when sub-bids are required, each must be accompanied by a deposit equal to five (5) percent of the sub-bid amount in the form of a bid bond in the name of which the Contract for the work is to be executed. The bid deposit shall be (a) in a form satisfactory to the Authority, (b) with a surety company qualified to do business in the Commonwealth and satisfactory to the Authority, and (c) conditioned upon the faithful performance by the principal of the agreements contained in the bid. Bidders must submit a Buy American Certificate with all bids or offers on AIP funded projects. Bids that are not accompanied by a completed Buy American Certificate must be rejected as nonresponsive. The successful Bidder will be required to furnish a performance bond and a labor and materials payment bond, each in an amount equal to 100% of the Contract price. The surety shall be a surety company or securities satisfactory to the Authority. Attention is called to the minimum rate of wages to be paid on the work as determined under the provisions of Chapter 149, Massachusetts General Laws, Section 26 to 27G, inclusive, as amended. The Contractor will be required to pay minimum wages in accordance with the schedules listed in Division II, Special Provisions of the Specifications, which wage rates have been predetermined by the U. S. Secretary of Labor and /or the Commissioner of Labor and Industries of Massachusetts, whichever is greater. This contract is subject to a Disadvantaged Business Enterprise participation provision requiring that not less than FOURTEEN AND ONE TENTH PERCENT (14.1%) of the Contract be performed by disadvantaged business enterprise contractors. With respect to this provision, bidders are urged to familiarize themselves thoroughly with the Bidding Documents. Strict compliance with the pertinent procedures will be required for a bidder to be deemed responsive and eligible. This Contract is also subject to Affirmative Action requirements of the Massachusetts Port Authority contained in Article 84 of the General Requirements and Covenants, and to the Secretary of Labor's Requirement for Affirmative Action to Ensure Equal Opportunity and the Standard Federal Equal Opportunity Construction Contract Specifications (Executive Order 11246). The General Contractor is required to submit a Certification of Non-Segregated Facilities prior to award of the Contract, and to notify prospective subcontractors of the requirement for such certification where the subcontract exceeds $10,000. A Contractor having fifty (50) or more employees and his subcontractors having fifty (50) or more employees who may be awarded a subcontract of $50,000 or more will, within one hundred twenty (120) days from the contract commencement, be required to develop a written affirmative action compliance program for each of its establishments. Compliance Reports - Within thirty (30) days of the award of this Contract the Contractor shall file a compliance report (Standard Form [SF 100]) if: (a) The Contractor has not submitted a complete compliance report within twelve (12) months preceding the date of award, and The successful Bidder will be required to purchase and maintain Bodily Injury Liability Insurance and Property Damage Liability Insurance for a combined single limit of $3,000,000. Said policy shall be on an occurrence basis and the Authority shall be included as an Additional Insured. See the insurance sections of Division I, General Requirements and Division II, Special Provisions for complete details. (b) The Contractor is within the definition of "employer" in Paragraph 2c(3) of the instructions included in SF100. The contractor shall require the subcontractor on any first tier subcontracts, irrespective of the dollar amount, to file SF 100 within thirty (30) days after the award of the subcontracts, if the above two conditions apply. SF 100 will be furnished upon request. SF 100 is normally furnished Contractors annually, based on a mailing list currently maintained by the Joint Reporting Committee. In the event a contractor has not received the form, he may obtain it by writing to the following address: Joint Reporting Committee 1800 G Street Washington, DC 20506 Complete information and authorization to view the site may be obtained from the Capital Programs Department Office at the Massachusetts Port Authority. The right is reserved to waive any informality in or reject any or all proposals.
Bid Results
Transportation Terminals
$1,964,525.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Find better bids. Win.
The best source for commercial construction data, period. Get instant access to up to five free projects and companies. Subscribe all contacts, documents, and details so that you can find new opportunities and win new business.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
April 14, 2021
May 31, 2021
July 5, 2021
375 Airport Dr, Worcester, MA
Related To This Project
Worcester, MA
Bid Date: Mar 03 2021
Worcester, MA
Bid Date: Jul 21 2020
Worcester, MA
Bid Date: Mar 03 2021
Worcester, MA
Bid Date: Nov 01 2019
Worcester, MA
Bid Date: Dec 04 2019
Worcester, MA
Bid Date: Nov 19 2019
Worcester, MA
Bid Date: Sep 10 2019
Worcester, MA
Bid Date: Dec 18 2018
Worcester, MA
Bid Date: Oct 26 2021
Worcester, MA
--
Worcester, MA
Bid Date: Jun 05 2023
Worcester, MA
Bid Date: Apr 26 2023
Worcester, MA
Bid Date: Apr 26 2023
Worcester, MA
Bid Date: Apr 20 2023
Worcester, MA
Bid Date: May 09 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--