BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 25, 2021 at 8:00 PM

Updated February 8, 2024

Site work and new construction of a water / sewer project in Thousand Oaks, California. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

The Work involves construction of improvements to allow Calleguas Municipal Water District ("Calleguas") and Las Virgenes Municipal Water District (LVMWD) to transfer water between their two systems. These improvements include (but are not limited to): construction of an underground concrete structure Pump Station / Pressure Regulating Station ("PS/PRS") including two vertical turbine pumps with 400 horsepower motors, suction and discharge piping and appurtenances, pressure regulating station, metering facilities, electrical facilities, two 500kW portable diesel standby generator sets, and related equipment; 30 inch diameter pipeline extending from the PS/PRS to Lindero Feeder No. 2; modifications to the existing Falling Star Meter Station and construction of a new metering station (TWSD Meter Station); and modifications to several existing air release and vacuum valves located along Lindero Feeder No. 2; and modifications to piping at Lindero Pump Station #1 (LPS1).

Award

Water / Sewer

$21,371,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Tiling
Division 11 - Equipment

Division 11 - Equipment

Educational and Scientific Equipment, Laboratory Equipment
Division 13 - Special Construction

Division 13 - Special Construction

Special Facility Components, Swimming Pools
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Grading, Excavation and Fill, Trenching, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
136
Active Projects
74
Bidding Soon
1,586
All Active Projects
624
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 25, 2021

July 26, 2021

img_map_placeholder

Multiple Locations, Thousand Oaks, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.