Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published January 13, 2025 at 7:00 PM
Updated January 14, 2025
Demolition, site work and addition to a detention facility in Kuna, Idaho. Design plans call for the addition of a detention facility.
This project is expected to be completed in three phases. The first phase includes civil infrastructure work for the east side of the jail. Phase two includes creating a secure corridor. Phase three includes new equipment and remodel of current kitchen. As of November 20, 2023, this project is in the conceptual phase. A the bond was rejected. Information regarding a future bond has not been established. Information regarding a design firm and the general contractor selection timeline has not been disclosed. A firm construction timeline has not been released. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Design
Jails / Prisons
$13,300,000.00
Public - County
Addition, Demolition, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 1, 2025
To Be Determined, Kuna, ID
Related To This Project
Kuna, ID
--
Kuna, ID
Bid Date: Nov 08 2023
Kuna, ID
Bid Date: Feb 13 2024
Kuna, ID
Bid Date: Feb 13 2024
Kuna, ID
Bid Date: Jul 09 2024
Kuna, ID
Bid Date: Aug 21 2024
Kuna, ID
--
Kuna, ID
--
Kuna, ID
Bid Date: Oct 27 2023
Kuna, ID
Bid Date: Mar 29 2022
Kuna, ID
Bid Date: Mar 31 2022
Kuna, ID
Bid Date: Apr 05 2022
Kuna, ID
Bid Date: Jan 17 2022
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
