BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Baldwin Park, California. Completed plans call for site work for a 3,492-square-foot, one-story above grade water / sewer project; playground / park / athletic field; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of Januaryr 3, 2024, this project has not yet been awarded. A timeline for award has not yet been established.** The improvements consist of the installation of a subsurface storm water infiltration system, a diversion structure, water quality inlets, diversion piping with control valves and flow meters, storm water pretreatment system, expansion and rehabilitation of the onsite parking lot, new diagonal parking along Patritti Avenue, new/improved play fields, walkway improvements, storm drain improvements in the neighborhood, construction of ADA accessible entrances to the park, irrigation system replacement, planting of drought-tolerant landscaping, installation of new play equipment, installation of picnic tables and BBQ grills, park expansion to the north (Futsal court), restroom addition in the community center, improved basketball courts, and swales. These improvements (along with others shown in the Contract Documents), when completed, will finalize the Barnes Park Multi-Benefit Storm water Capture Project. Contractor shall commence the services pursuant to these specifications upon receipt of a written notice to proceed and shall perform all services within 370 days. bidders bond made payable to the City of Baldwin Park or issued by a surety admitted doing business in California, for an amount equal to at least ten percent (10%) of the amount bid. A faithful performance bond in an amount equal to one hundred (100) percent of the contract price shall be furnished as security for completion of this contract, separate labor and material payment bond in an amount equal to one hundred (100) percent of the contract price shall be furnished as security for payment of all persons performing labor and furnishing materials in connection with this contract. New Question Deadline 10/23/2023 at 5:00 PM In accordance with the provisions of Sections 1770 et seq., of the Labor Code, the Director of the Industrial Relations of the State of California has determined the general prevailing rate of wages applicable to the work to be done Prior to contract execution, the contractor and his/her subcontractors shall obtain a City of Baldwin Park business license It is agreed by the parties that if the improvements are not completed by the time prescribed to complete the work, City and Contractor agree that Contractor will pay to City, not as a penalty, but as predetermined liquidated damages, the sum specified in the Construction contract / Agreement (Five Hundred Dollars - $500.00 - per day) for each and every working days delay beyond the time prescribed to complete the work. The City of Baldwin Park reserves the right to reject any and all bids and to waive any minor irregularities in the bid documents

Bid Results

Water / Sewer

$17,088,481.00

Public - City

Paving, Site Work

120

33

23

4

Subscribe For Documents

68 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
504
Active Projects
227
Bidding Soon
3,652
All Active Projects
1,617
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

November 14, 2023

January 8, 2024

June 9, 2025

img_map_placeholder

3251 Patritti Ave, Baldwin Park, CA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.