BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 13, 2021 at 8:00 PM

Updated December 10, 2024

Site work and paving for a road / highway in Woodsfield, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of 05/13/2021 It was verified that these project has not yet been awarded. NOTICE TO BIDDERS CR30 ROAD IMPROVEMENT PROJECT - MONROE COUNTY Sealed proposals will be received at the office of the Monroe County Commissioners, 101 N. Main Street, Room 34, Courthouse, Woodsfield, OH 43793, until 11:00 a.m. on Monday, April 12, 2021, for the furnishing of all labor, materials and equipment necessary to complete the project known as the Monroe County CR30 Road Improvement Project which consists of resurfacing and cement stabilization spot repairs. The bids will be publicly opened and read aloud at the above said time and place. Contract documents, bid sheets, plans and specifications can be obtained at the Monroe County Engineers Office, 47134 Moore Ridge Road, Woodsfield, OH 43793. Each bidder is required to furnish with its proposal, a Bid Guaranty and Contract Bond in accordance with section 153.54 of the Ohio Revised Code. Bid security furnished in bond form, shall be issued by a Surety Company or Corporation licensed in the State of Ohio to provided said surety. Each proposal must contain the full name of the party or parties submitting the proposal and all persons interested therein. Each bidder shall be pre-qualified by the Ohio Department of Transportation at the time of the bid opening and shall submit certification of said approval and pre-qualifications with bid. The owner intends and requires that this project be completed no later than September 30, 2021. All contractors and subcontractors involved with the project will, to the extent practicable use Ohio Products, materials, services, and labor in the implementation of their project. Additionally, contractor compliance with the equal employment opportunity requirements of Ohio Administrative Code Chapter 123, the Governor’s Executive Order of 1972, and Governor’s Executive Order 84-9 shall be required. Bidders must comply with the prevailing wage rates on Public Improvements in Monroe County as determined by the Ohio Bureau of Employment Services, Wage and Hour Division. The Board of Monroe County Commissioners reserves the right to reject any an all bids March 25, April 1, 2021 - - - - - - - - - - - - - - - - - -

Bid Results

Roads / Highways

$143,506.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
175
Active Projects
75
Bidding Soon
1,535
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2021

May 12, 2021

Project location map

Co Rd 30, Woodsfield, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.