BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Milwaukie, Oregon. Completed plans call for site work for a four-acre playground / park / athletic field.

Milwaukie Bay Park Summary: Phase 3 of Milwaukie Bay Park improvements, including: new restroom, interactive water feature, playground, picnic area, pathways, plantings, new stormwater management infrastructure, and a gathering space. Applicant: Heather Koch, NCPRD Address: 11211 SE McLoughlin Blvd File: NR-2022-001 (primary file); WG-2022-001; VR-2022-006; DR-2022-001 Staff: Senior Planner Vera Kolias ___________________________ Lease Crutcher Lewis is the awarded Construction Manager / General Contractor and is seeking 50% DD Budget Pricing. Plans call for the Selective Demolition and Reconstruction of existing Milwaukee Bay Park. Along the OR 99E right-of-way, approximately 7,600 square feet of concrete sidewalk will be removed to accommodate new sidewalk alignment. The existing traffic signal mast arm and cross walk sensor at Monroe Street will need to be relocated out of the proposed sidewalk corridor. The three light bollards at the north end of the trail will also need to be removed/relocated. Near the Monroe Street intersection, the existing artwork, stairs, boulders, paving, and light fixture will be removed and salvaged for Owner. Approximately 200 linear feet of abandoned gas line and 2,600 square feet of asphalt trails will also to be removed. Along the southwest corner of the site, the newly constructed Field Inlet and approximately 110 linear feet of 12inch ductile iron storm pipe will be removed. Refer to the Electrical Narrative for additional utility demolition associated with power. Water Service It's anticipated that a new 2-inch potable water service with double check will be required to serve the restroom facilities, water feature, and drinking fountains. Another reduced pressure (RP) backflow device is anticipated to be required for the water feature. An existing 10-inch DIP is located along the park frontage within the curb line, so no roadway patch work will be necessary for this new service. It is estimated that 25 LF of 2-inch water line will be necessary to serve the restroom and water feature control (assumed to be in the restroom building). An additional 10 LF of 1/2 -water line will be necessary for the drinking fountain in front of the restroom building.

Post-Bid

Playgrounds / Parks / Athletic Fields

$325,000.00

Public - County

Site Work

61

8

2

3

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
28
Bidding Soon
576
All Active Projects
282
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2022

February 6, 2023

img_map_placeholder

11211 SE McLoughlin Blvd, Milwaukie, OR


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.