BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Lincoln, Nebraska. Completed plans call for site work for a road / highway.

The City of Lincoln will have a water main in the project area as designed per project number 803407. A sanitary sewer line crosses Holdrege Street east of N 104th Street. All work within this area which may impact public water facilities will require coordination with the City of Lincoln Water System, City of Lincoln Wastewater System, and the City's Project Manager to minimize impact to daily activities. The Contractor shall have a total of 135 consecutive calendar days from the Beginning of Work date to achieve final completion of this project. Contractor may elect to pothole utilities between Notice to Proceed and Beginning of Work without charges of calendar days. The project shall be substantially complete by November 1, 2021. Seeding shall occur per Chapter 30 of the City of Lincoln Standard Specifications. Substantial completion shall be defined as all roadway construction being complete and all lanes open to traffic, storm sewer construction complete, all sidewalk/bike path construction complete, all temporary construction signs and barricades removed, all permanent pavement marking and signing complete, all roadway lighting complete and operational, and final grading complete. Final completion of all work including final site clean-up, establishment and acceptance of seeded areas shall be completed by November 24, 2021. Determination of Substantial Completion and Final Completion shall be subject to the City's Project Manager's approval. Failure to meet these dates shall result in liquidated damages to be assessed per the Standard Specifications. The Contractor may begin tree removal on properties where the City has obtained the necessary easements or rights of entry prior to the Beginning of Work date upon approval of the City's Project Manager. Early work to remove tree

Bid Results

Roads / Highways

$1,648,114.00

Public - City

Paving, Site Work

145

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
41
Bidding Soon
494
All Active Projects
204
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 14, 2021

May 14, 2021

img_map_placeholder

Holdrege St, Lincoln, NE

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.