BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2023 at 8:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Eugene, Oregon. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of June 6, 2023, project was awarded to RiverBend Construction Co., awarded amount is $1,798,350.70.** Chambers Street Paving 900360 1 LS General Excavation; 1,810 LF 8-Inch Diameter Ductile Iron Pipe; 2,921 SY Aggregate Working Platform, 12" Thick; 70,950 SF Cold Plane Pavement Removal, 4 Inches Deep; 2,998 TN Level 3, 1/2 Inch ACP Mixture; 2,040 SF Concrete Walk, Ramp, 4 Inches Thick; 16 EA Detector Loop Installation; 1 LS Traffic Signal, Complete All work must be completed by September 1, 2023. A Bid guaranty is not required for this project. Filing of a qualification questionnaire before bidding will not be required. The City may reject any bid not in compliance with all prescribed public bidding procedures and requirements, and may reject for good cause any or all bids or to waive any specification or requirement upon a finding of the City that it is in the public interest to do so. For more information regarding this project, contact Jennah Maier at 541-852-2227 or jmaier@eugene-or.gov. Installing approximately 1810 feet of 8-inch ductile iron pipe and appurtenances, including maintaining temporary asphalt pavement along the project alignment per City of Eugene standards. Installing approximately 20 feet of 6-inch ductile iron pipe and appurtenances, including maintaining temporary asphalt pavement along the project alignment per City of Eugene standards Installing approximately (2) 2-inch services, including temporary and permanent restoration of the road surfacing per City of Eugene standards Installing approximately (42) 1-inch services, including temporary and permanent restoration of the road surfacing per City of Eugene standards. Installing (1) fire hydrants. Complete locate tracer wire continuity testing, water main flushing and hydrostatic pressure testing of the new pipeline.

Award

Roads / Highways

$1,798,351.00

Public - City

Paving, Site Work

66

7

2

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
13
Bidding Soon
287
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.