Published April 13, 2021 at 8:00 PM

Updated June 3, 2025

Site work for a civil project in Middletown, New York. Completed plans call for site work for a water / sewer project.

Site changes include replacing existing pipe with a 48 inch reinforced concrete pipe, reconstructing the boulder deflector vane to effectively direct water into the inlet and extending the rep rap on top of the inlet approximately 200' downstream. Once installed, regrading a portion of the channel. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 15% Women Owned Sub-Contracting Goal: 15% The work includes providing all labor, materials, machinery, tools, equipment, and other means of construction necessary and incidental to the completion of the work shown on the plans and described in these specifications including but not necessarily limited to the following: The site changes include replacing the existing pipe with a 48-inch reinforced concrete pipe, reconstructing the boulder deflector vane to effectively direct water into the inlet, and extending the rip rap on top of the inlet for approximately 200' downstream. By extending the inlet structure, a low section of the bank will be blocked off and the elevation of the structure will be increased to 1331.0' to match the high points at each end of the structure. In addition, the inlet structure is being extended downstream along the left bank of Binnekill Creek so that it cuts off the side-channel depressions that allow the EBDR to flow around the inlet and enter the Binnekill during flood events. Once the structure is installed, a small portion of the Binnekill Creek channel near the existing inlet will be regraded to maintain the discharge capacity of the inlet Questions or requests for clarification may be directed to SLR at 231 Main Street, Suite 102, New Paltz, NY 12561 in written format or via email to Ellen Hart of SLR at emhart@slrconsulting.com. Responses will be communicated by addendum to all bidders who have obtained the Contract Documents. The deadline for submitting questions is Friday, April 9, 2021 at 4:00pm. Contract term: Approximately four months Owner reserves the right to reject any and all Bids, to waive any and all informalities, and the right to disregard all nonconforming, nonresponsive, or Conditional Bids. This project is being financed with the U.S. Department of Housing and Urban Development ("HUD") Community Development Block Grant - Disaster Recovery ("CDBG-DR") funds administered by the NYS Governor's Office of Storm Recovery ("GOSR"). Attention of bidders is particularly called to Section 3 requirements, M/WBE goals, Federal labor standards, Federal and State prevailing wage rates, online reporting requirements using Elations System, Inc. and GOSR supplementary Contract Conditions.

Post-Bid

Water / Sewer

$500,000.00

Public - City

Site Work

15

1

5

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
768
Active Projects
400
Bidding Soon
6,305
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2021

May 17, 2021

Project location map

Multiple Locations, Middletown, NY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.