BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 24, 2021 at 8:00 PM

Updated March 10, 2026

Site work and paving for a mixed-use development in Oak Harbor, Ohio. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and water / sewer project.

The scope of work consists of the complete reconstruction of Park Street from Church Street to Locust Street, a distance of 625 feet. In addition to the reconstruction, the work includes the installation of curb and gutter, five-foot wide concrete walk and drive aprons, and new storm sewer installation, as well as related work. The contract documents, including plans and specifications, are on file at the office of the Village and the Engineer - Poggemeyer Design Group, Inc. (PDG). The bid guaranty may be of two forms: 1. A Bid Guaranty and Contract Bond using the form in the Contract Documents. (The amount of the bid does NOT have to appear on this form.) 2. A certified check, cashier’s check or letter of credit in favor of the Village of Oak Harbor, Ohio in the amount of 10% of the bid. If the contract is awarded, a Contract Bond will be required, which is a 100% payment and performance bond. After the award of the contract let by competitive bid and prior to the time the contract is entered into, bidders shall submit the affidavit required under the Ohio Revised Code, Section 5719.042 that the bidder was not charged with any delinquent personal property taxes in Ottawa County, Ohio. The successful bidder will be required to pay not less than the minimum wage rates established by the Department of Industrial Relations of the State of Ohio. The Village of Oak Harbor, Ohio reserves the right to reject any and all bids and to waive any irregularity in any bid and to determine the lowest and best bidder. No bidder may withdraw his bid for a period of 60 days after the scheduled closing time for the receipt of bids. The estimate for the cost of construction is: $390,000.00.

Bid Results

Roads / Highways

$319,789.00

Public - City

Paving, Site Work

19

8

6

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
18
Bidding Soon
1,866
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 13, 2021

May 13, 2021

Project location map

W Park St, Oak Harbor, OH

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.