BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 24, 2021 at 8:00 PM

Updated January 26, 2024

Renovation of a mixed-use development in Milwaukee, Wisconsin. Completed plans call for the renovation of a parking garage; and residential development.

Bid Results: Kelly/AJ Development $14,634.80 Premier Roofing Design dba Top Roofing $15,400.00 Furnish labor, material and services necessary to remove existing roof on the house and garage, clean gutters and downspouts, and provide gutter extensions, at the occupied single family home located at 3537 N. 9th Street, Milwaukee, per the following scope: ROOF 1. Safeguard property from falling objects coming from the roof of house and garage. 2. Remove existing shingles, drip edge, de-icing systems, vents and any damaged or rotted roof sheathing and/or deck board on house and garage. NOTE: Coordinate with Project Manager for viewing of roof condition, and or any necessary repairs, prior to installing new roofing materials. 3. Replace any rotted or missing boards and roof sheathing, and properly prepare surface for roofing material. 4. Dispose of any cable lines, antenna and satellite dishes, etc. 5. Install new gutter apron in guttered areas and new drip edge on eaves as applicable. Space Gutter apron to receive gutter behind the flashing, or install gutter when installing gutter apron flashing. 6. Install new 3' wide ice and water shield at base of roof covering gutter apron on roof (on house only). Install 18" wide ice and water shield on eaves covering top of drip edge flashing. 7. Install 30 lb. felt paper on balance of roof of house and garage from edge to edge of roof. 8. Install new drip edge on gutter apron to eaves as applicable (on house). 9. Install starter strips at roof eaves. Step flashing (4x4x8 galvanized) should be used at all edges. Flashing to be installed under all shingles. All joints to be fitted tightly, accurately, and strapped securely to house and garage. Not to secure roof straps on shingles. 10. Install ridge vent. Certainteed 12" Filtered Exhaust Vent, or approved equivalent compatible with roofing system. Seal openings from any prior venting. Use manufacturer supplied cap shingles of matching color to dimensional shingles for ridge caps. Any exposed nail heads to be covered with roof caulk or tar. If bidding on a different brand, please specify: 11. Install new lead vent stack covers for all existing plumbing roof vents. 12. Install 30 year dimensional shingles Landmark Certainteed, or approved equivalent. PROJECT MANAGER MUST APPROVE THE COLOR BEFORE INSTALLATION. Use a minimum of 4 galvanized nails per shingle; nails to be sufficient in length to secure shingle, and install at a 90 degree angle to surface. Installation to follow manufacturer guidelines.

Award

Residential Subdivision

$14,635.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
328
Active Projects
111
Bidding Soon
1,975
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 7, 2021

April 12, 2021

Project location map

3537 N 9th St, Milwaukee, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.