BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published December 13, 2021 at 7:00 PM

Updated January 26, 2024

Site work and paving for a road / highway in Baton Rouge, Louisiana. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

The proposed scope of work includes intersection/interchange improvements. Highland Road between Perkins Road and Old Perkins intersections is generally two or three lanes in each direction. The I-10 on- and off-ramps are included within the project limits. The proposed project will provide additional capacity for off-ramps and minimize congestion within the corridor. The MOVEBR Transportation and Infrastructure Improvements Program is the most significant transportation infrastructure investment in East Baton Rouge Parish history. The 1/2 cent sales tax proposition was approved by the voters of East Baton Rouge Parish on December 8, 2018. The tax became effective on April 1, 2019 and will continue for 30 years until March 31, 2049. As of December 13, 2021, letting is anticipated to take place in 2029.* *For more information on MoveBR project, please refer to https://movebr.brla.gov/page/project-list

Conceptual

Roads / Highways

$10,800,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
112
Bidding Soon
1,113
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2029

Project location map

Highland Rd, Baton Rouge, LA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.