BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 19, 2025 at 8:00 PM

Updated September 20, 2025

Site work and paving for a road / highway in Greenwel Spgs, Louisiana. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

Wax Road is a three-lane corridor until just before the bridge crossing Beaver Bayou where it then becomes a two-lane roadway. The corridor is generally bordered by undeveloped land. The planned improvements include a four-lane boulevard with sidewalks on each side of the roadway and a closed drainage system. As of September 19, 2025, this project is still in the planning phase and is further down the prioritization list. A design firm has not yet been chosen. The letting is anticipated for 2029.

Conceptual

Roads / Highways

$38,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
220
Active Projects
99
Bidding Soon
1,044
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2029

Project location map

Wax Rd, Greenwel Spgs, LA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.