BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Norco, California. Completed plans call for site work for a water / sewer project.

The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Contract Documents, Specifications and Plans for the above stated project. The general items of work to be done hereunder consist of construction of Riverside County Flood Control and Water Conservation District (RCFC&WCD) Master Drainage Plan Line S-5A Extension which runs along the east side of Norco Intermediate School and starts approximately 200 feet south of Kingman Drive and connects to the S-5 Line located at Hillside Lane. The project will also include construction of Line S-6 Lateral located on Temescal Avenue approximately 800 feet north of the intersection of Second Street and Temescal Avenue and runs westerly to connect to South Norco Channel. Project includes installation of RCP pipe 30" and 42" in diameter, HDPE pipe 18" in diameter, manholes, junction structures, curb and gutter, PCC sidewalk, AC paving, concrete bulkhead and any other necessary appurtenances and related work to the satisfaction and acceptance of the City Engineer There are 45 working days allowed to complete this project. Liquidated damages shall be assessed at $1,000.00 per working day. Any Contract entered into pursuant to this notice will incorporate the provisions of the State Labor Code. Compliance with the prevailing rates of wages, apprenticeship employment standards, and Contractor registration program established by the State Director of Industrial Relations will be required. Affirmative action to ensure against discrimination in employment practices on the basis of race, color, national origin, ancestry, sex, or religion will be also required. The Contract Documents call for monthly progress payments based upon the engineer's estimate of the items of work completed. The AGENCY will retain 5 percent of each progress payment as security for completion of the balance of the work. At the request and expense of the successful Bidder, the City of Norco will pay the amounts so retained upon compliance with the requirements of Government Code Section 4590 and the provisions of the Contract Documents pertaining to Substitution of Securities. No Contractor or Sub-Contractor may be listed on proposal unless they are registered with the Department of Industrial Relati ns (DIR) pursuant to Labor Code Section 1725.5. Proposals must be accompanied by a proposal guarantee consisting of a certified check or bid bond payable to the AGENCY in the amount of 10 percent of the total amount bid. Any proposal not accompanied by such a guarantee will not be considered. If a Bidder to whom a contract is awarded fails or refuses to execute the Contract Documents or furnish the required insurance policies and bonds as set forth in these documents, the proposal guarantee shall be forfeited to the AGENCY. The proposal guarantee of all Bidders will be held until the successful bidder has properly executed all Contract Documents.

Award

Water / Sewer

$343,321.00

Public - City

Site Work

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
214
Active Projects
106
Bidding Soon
2,288
All Active Projects
1,026
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2021

May 24, 2021

img_map_placeholder

Multiple Locations, Norco, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.