Site work and paving for a mixed-use development in Orono, Minnesota. Completed plans call for site work for a one-story above grade municipal facility; for paving for a sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

As of October 12, 2022, the project has been awarded. A timeline for construction has not been confirmed. Project Number-0V1125044, 09621002 This is a single lump sum bid contract for a new public works facility, including the main building, fuel island, landscaping, and site improvements. The project includes all building and site components as shown on the drawings and specified herein. This is a one-story facility, with mezzanine spaces and all conventional and special building systems as specified. B. The work includes all sections that are incorporated herein this specification, specific work sections of division 2 through 48 (except where indicated in the Table of Contents that a specific division is not included) along with divisions 0 and 1, which govern all the specific work involved in the project. C. Other key items relative to the work and the contract include but are not limited to the following: 1. This is not a prevailing wage project. 2. All building and site related permits shall be "pulled" and paid for by the contractor. 3. Erosion control and SWPPP plans are included in the set of documents for use and execution by the contractor. D. This is a single lump sum bid type of project, with the general contractor being responsible for all subcontractors working on the site and providing materials and equipment, as well as any sub-subcontractors and suppliers. E. The contractor shall include a 5% Bid Bond with submission of the Bid and shall include 10% Performance and Payment Bond to the contractor of record The Contractor may start and stop work, especially over the winter period to conserve temporary heat, provided that the Substantial Completion dates for the main facility and site are completed by April 15th, 2023. Contractor will also be allowed to complete the work earlier than the dates shown although there will be no premium provided to the contractor in doing so. Otherwise, Target / contract dates are as follows: Bids due: September 15, 2022 Tentative contract execution: September 26, 2022 Substantial completion of the facility: April 15, 2024 (start of 1 year correction period) Completion of all project components and punch list: May 31, 2024 *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Municipal

$16,067,000.00

Public - City

Paving, Site Work

116

33

60

4

Subscribe For Documents

47 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
128
Active Projects
67
Bidding Soon
1,626
All Active Projects
541
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 15, 2022

November 14, 2022

May 31, 2024

img_map_placeholder

365 Old Crystal Bay Rd S, Orono, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.