Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published October 4, 2023 at 8:00 PM
Updated January 26, 2024
Site work, paving and new construction of a civil project in Marana, Arizona. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the construction of a bridge / tunnel; road / highway; and road / highway.
The Project will address the existing bridge's structural and drainage deficiencies by providing a new twolane bridge, replace or reconstruct the existing culverts, and improve traffic flow. The scope of work includes, but is not limited to, remove asphaltic concrete; remove existing bridge and corrugated metal pipes; construct a new two-lane bridge; construct concrete headwalls, wingwalls, and inlet/outlet aprons; extend an existing culvert and construct a new culvert; signs and pavement markings; grading; and construct roadways to new bridge. Solicitation No. SFQ-PO-2400008 TRACS NO.: T028201C FEDERAL ID NO.: PPM-0(267) Project No. 4SRBWB Estimated cost for the project is between $2,500,000.00 and $3,000,000.00. The project shall be complete and in place within 260 working days from Notice to Proceed. The County reserves the right to reject any and all proposals or to withhold the award for any reason.
Post-Bid
Bridges / Tunnels
$3,000,000.00
Public - County
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 12, 2023
November 13, 2023
W Silverbell Rd, Marana, AZ
Related To This Project
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed