Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a civil project in Marana, Arizona. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the construction of a bridge / tunnel; road / highway; and road / highway.
The Project will address the existing bridge's structural and drainage deficiencies by providing a new twolane bridge, replace or reconstruct the existing culverts, and improve traffic flow. The scope of work includes, but is not limited to, remove asphaltic concrete; remove existing bridge and corrugated metal pipes; construct a new two-lane bridge; construct concrete headwalls, wingwalls, and inlet/outlet aprons; extend an existing culvert and construct a new culvert; signs and pavement markings; grading; and construct roadways to new bridge. Solicitation No. SFQ-PO-2400008 TRACS NO.: T028201C FEDERAL ID NO.: PPM-0(267) Project No. 4SRBWB Estimated cost for the project is between $2,500,000.00 and $3,000,000.00. The project shall be complete and in place within 260 working days from Notice to Proceed. The County reserves the right to reject any and all proposals or to withhold the award for any reason.
Post-Bid
Bridges / Tunnels
$3,000,000.00
Public - County
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
September 12, 2023
November 13, 2023
W Silverbell Rd, Marana, AZ
Related To This Project
Marana, AZ
Bid Date: Sep 27 2023
Marana, AZ
Bid Date: Oct 03 2023
Marana, AZ
Bid Date: Oct 04 2023
Marana, AZ
Bid Date: Nov 30 2021
Marana, AZ
--
Marana, AZ
Bid Date: Feb 01 2022
Marana, AZ
Bid Date: Dec 09 2021
Marana, AZ
--
Marana, AZ
Bid Date: Dec 07 2023
Marana, AZ
Bid Date: Jul 13 2023
Marana, AZ
Bid Date: Apr 16 2024
Marana, AZ
Bid Date: Jun 15 2023
Marana, AZ
Bid Date: Jun 14 2023
Marana, AZ
Bid Date: Jun 01 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.