BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Centerville, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

**As of May 5,2021 This project has been awarded for the amount of $56,415.94. Start date and completion date has not yet been established.** Project involves sealing and striping various parking lots and hiker biker paths throughout the City. The City of Centerville is soliciting proposals to provide all labor, equipment, and materials including traffic control necessary to clean, seal, crack seal, and stripe (re-trace) the parking lots and hiker-biker paths at various locations. Linear Foot Concrete Joint Milling and Repair, 12 inches wide C253 Linear Foot Concrete Joint Milling and Repair, 24 inches wide C253 Linear Foot Concrete Joint Milling and Repair, 36 inches wide Location-Specific Timing and Striping Details: o City Hall (100 W Spring Valley Rd) - Weekend work is preferred as there is high traffic in this parking lot during the weekdays in the daytime and evenings. Some evening work after 6PM may be possible. The contractor and City shall review dates for this work. o Striping: 3,130' of 4" White Parking Lot Stall Marking 8 White Handicap Symbols 337' of 5" White Transverse Lines o Stubbs Park Parking Lots (255 W Spring Valley Rd) - Work shall occur Monday thru Friday. Work will need to be staged to accommodate patron parking and to maintain access via one of the two access points at all times. The successful contractor will be provided detailed schedules of events so they may plan their work schedule. o Striping: 3,660' of 4" White Parking Lot Stall Marking 15 White Handicap Symbols 361' of 5" White Transverse Lines o Stubbs Park Walking Paths (255 W Spring Valley Rd) - Work shall occur Monday thru Friday. o Public Works (7970 South Suburban Rd) - Work in the front parking lot shall occur on Fridays. Work in the back parking lot shall occur in two phases on Fridays only. o Striping: 1,200' of 4" White Parking Lot Stall Marking 3 White Handicap Symbols 4 Straight Lane Arrows 108' of 4" Yellow Transveerse Lines 180' of 5" White Transverse Lines o Benham's Grove (166 N. Main St.) - Sealing & Striping must be done on Monday, Tuesday, or Wednesday during the day o Striping 1,441' of 4" White Parking Lot Stall Marking 4 White Handicap Symbols 233' of 5" White Transverse Lines 40' Double Yellow Line, each line 4" 40' of White 8" Channel Lines 3 White LaneArrows (1 Left, 1 Right, 1 Straight) Uptown NW Quadrant - Work in Uptown will need to be staged to accommodate patron parking and maintain traffic. Work must occur Monday thru Friday. o Striping: 1,615' of 4" White Parking Lot Stall Marking 7 White Handicap Symbols 427' of 5" White Transverse Lines 6 Straight Lane Arrows o Uptown NE Quadrant - Work in Uptown will need to be staged to accommodate patron parking and maintain traffic. Work must occur Monday thru Friday. o Striping: 737' of 4" White Parking Lot Stall Marking 3 White Handicap Symbols 246' of 5" White Transverse Lines o Cross Point Church (38 N. Main St) - Work shall occur Monday thru Friday. o Striping: 1,815' of 4" White Parking Lot Stall Marking 6 Handicap Symbols 526' of 5" White Transverse Lines 3 Straight Lane Arrows o Westerfield Dr. (84 W Franklin) - Work shall occur Monday thru Friday. o Striping: 83' of 4" White Parking Lot Stall Marking 1 Handicap Symbol o Crack Sealing at Yankee Trace Clubhouse (10000 Yankee St) - Work shall occur Monday thru Friday and shall be scheduled around events and high volume days at the golf course.

Award

Roads / Highways

$56,416.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

1

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
229
Active Projects
128
Bidding Soon
2,687
All Active Projects
1,213
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 15, 2021

May 17, 2021

November 5, 2021

img_map_placeholder

Multiple Locations, Centerville, OH

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.