BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Omaha, Nebraska. Completed plans call for the construction of a 365,000-square-foot educational facility; and playground / park / athletic field.

*Please contact the construction manager for access to the bid results. MCL Construction-Construction Manager at Risk (CM@R) for the New Gretna High School #2 Bid Package #6 Project Description Gretna Public Schools is constructing a new high school building and related site grading, improvements, utilities, parking and interior roadways, outdoor athletic facilities, and buildings and other infrastructure to support the high school building, consisting of approximately 365,000 square feet, to be located at 18102 Lincoln Road, Omaha, NE 68136. Notice to Bidders: MCL Construction is requesting bids for the following Bid Packages: 1. Specification Section 057000 Decorative Metal 2. Specification Section 079100 Preformed Joint Seals 3. Specification Section 079200 Joint Sealants 4. Specification Section 079513.13 Interior Expansion Joint Cover Assemblies 5. Specification Section 102600 Wall and Door Protection 6. Specification Section 123616 Metal Countertops 7. Specification Section 321216 Asphalt Paving 8. Specification Section 321801 Synthetic Turf Aggregate and Base Construction 9. Specification Section 321813 Synthetic Turf Surfacing Football and Soccer 10. Specification Section 321814 Synthetic Turf Surfacing for Baseball and Softball 11. Specification Section 321819 Tennis Court Surfacing 12. Specification Section 321823 Running Track Resilient Surfacing 13. Specification Section 322200. 13 Tennis Court Base Construction 14. Specification Section 325100 Athletic Equipment 15, Specification Section 328400 Planting Irrigation 16. Specification Section 329200 Turf and Grasses 17. Specification Section 329300 Plants Subcontractors, at their discretion, may combine multiple bid packages into one package. All Subcontractors and Material Suppliers will be required to provide a dual obligee Payment and Performance bond, for the former, and a dual obligee Supply Bond, for the latter, listing MCL and Gretna Public Schools as obligees. No bidder shall withdraw his bid within 30 days after the actual date of the opening thereof. MCL reserves the right to reject any, and all bids, to waive irregularities and informalities therein, and to award the contract in the best interest of the owner. *Please note that the listed value reflects the entire scope of work.

Award

Educational

$14,770,000.00

Public - City

New Construction, Paving, Site Work

1536

69

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
36
Bidding Soon
531
All Active Projects
219
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 27, 2021

June 25, 2021

img_map_placeholder

18102 Lincoln Road, Omaha, NE

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.