EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 23, 2021 at 8:00 PM

Updated October 1, 2024

Site work and paving for a transportation facility in Lemont Furnace, Pennsylvania. Completed plans call for site work for a transportation facility; and for paving for a transportation facility.

The prospective Bidder is encouraged to contact John Bud Neckeraur, Airport Manager for review of documents at 724-628-2276 for information on where the documents are located within their office and any special procedures for accessing the documents. All inquiries should be directed to the Project Manager, April E. Rohrbaugh at 724-438-4010 or via email at aprilrohrbaugh@sleighterdesign.com. Bids shall be prepared and submitted on the prescribed forms in accordance with instructions contained in the Instructions to Bidders and General Provisions (Section 20) Divisions of the Project Manual. The Fayette County Airport Authority expressly reserves the right to accept or reject any or all bids or to waive any informalities in the same. Each bidder must deposit with his/her proposal a bid security in an amount equal to at least 10% of his/her Base Bid. Said security shall be in the form and subject to the conditions given in Section 20 of the General Provisions. No bidder may withdraw his/her bid within 120 days after the actual date of the opening thereof. Successful bidders must enter into the Agreement and furnish a Contract Bond and evidence of required insurance with fifteen (15) days after notification acceptance of such proposals, all as more specifically required in the Contract Documents. Wages as predetermined by the US Secretary of Labor and included in the specifications and contract documents and/or addenda thereto shall be used by the CONTRACTOR in paying labor in connection with the work under this contract. All work under this contract shall be subject to the regulations contained in Division 8 of the Project Manual. The Fayette County Airport Authority, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 USC 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 26, Nondiscrimination in Federally-assisted programs of the Department of Transportation, issued pursuant to such Act, hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The Fayette County Airport Authority is committed to assuring that small business concerns owned and controlled by socially and Economically Disadvantaged Individuals (DBE) are included in projects it sponsors. Overall goals have been established as 2.34% for Disadvantaged Business Enterprises for the fiscal year 2021. The Fayette County Airport Authority is committed to meeting this goal on all services provided, and the CONTRACTOR is expected to put every effort forward to meet the above DBE goal. Proposals must include the percentage involvement of Disadvantaged Business Enterprises along with the names of the firms involved, and the completed certification. Please note that certification as a DBE by the PA UCP is separate and distinct from other certification programs. The only source that should be used for verification of current eligibility of a DBE Firm is the PA UCP portal. Physical certification letters and/or expiration dates should not be requested from DBE Firms.

Post-Bid

Transportation Terminals

$878,670.00

Public - County

Paving, Site Work

Subscribe For Documents

27 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Temporary Facilities and Controls, Temporary Utilities, Temporary Water, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Construction Layout, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Sheathing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Furnishings and Accessories, Portable Lamps, Lamps
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Lighting
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fertilizing, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Soil Preparation, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Culverts, Pipe Culverts
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Control Equipment
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Bulk Material Processing Equipment, Batching Equipment, Mixers, Piece Material Handling Equipment, Cranes and Hoists, Mobile Plant Equipment, General Vehicles, Maintenance Vehicles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
93
Bidding Soon
773
All Active Projects
357
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2021

June 7, 2021

img_map_placeholder

988 Sky Dr, Lemont Furnace, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Taxiway F Rehabilitation

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.