BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a municipal facility in Las Vegas, Nevada. Completed plans call for the renovation of a municipal facility.

The Questions cutoff date of April 27, 2021 to 10:00 a.m has been changed to May 12, 2021 to 10:00 a.m. Clark County invites qualified firms or individuals to submit bids. Questions regarding this bid must be directed to the Bid Contact Name Geraldine Cruz Address 500 S Grand Central Pkwy Las Vegas, NV 89106 USA Phone 1 (702) 455-6277 Fax 1 (702) 868-2536 Email geraldine.cruz@clarkcountynv.gov The Project of which the Work of the Contract is a part titled Regional Justice Center Cooling Tower & Boiler Replacement and is located at 270 E Clark Ave, Las Vegas, Nevada 89101. The Work is described in the Project Drawings and Divisions 01 through 48 of the Project Manual. The Work consists of all labor, materials, permits, and equipment necessary to demo and replace (3) existing field erected cross-flow cooling towers, (2) existing natural gas-fired high mass boilers, (3) natural gas-fired condensing boilers, (2) primary heating hot water circulation pumps and other associated systems per architectural, mechanical, plumbing, electrical, and structural drawings and specifications and as required for the successful installation of the systems shown with limited interruption to existing operations as noted. Construction includes all administrative work as outlined in the Division 01 General Requirements and the following using materials noted on Drawings and Specifications: at the existing cooling tower yard consists of the demolition of various existing equipment, appurtenances and components necessary for the installation of the new cooling towers, inlet and outlet piping, valves and accessories, control valves, make-up water piping, drain piping, power and controls; demolition of the existing dolphin water treatment system; installation of supports, pads and platforms; priming and painting of the entire remaining and new structural steel supports. Installation of three basin sweepers and associated piping; priming and painting of the entire remaining and new structural steel supports. Work at existing chiller plant and temporary chiller yard consists of installation and connection of permanent emergency chilled water piping/fittings and temporary chilled water piping/fittings to (3) temporary packaged air-cooled rental chillers on separate flat-bed mobile trailers. Temporary chillers will be connected, interfaced, commissioned and controlled by existing Johnson Controls building automation system. Work at boiler plant consist of the removal of (5) existing natural gas-fired boilers and appurtenances, (4) existing heating hot water pumps, associated existing piping/fittings, existing hydronic valves and appurtenances, existing control valves, existing piping supports, existing equipment pads, existing power and controls as necessary for connection to the new equipment and systems; installation of (8) natural-gas fired boilers with associated heating hot water piping, pumps, devices and accessories; installation of (3) plate and frame heat exchangers and associated heating hot water piping, equipment, devices, pumps and accessories to the existing heating hot water system; roof openings and roofing for boiler flue penetrations through roof; demolition of existing flues, patching and weather-proofing of unused roof openings. Removal of two building heating hot water pumps. Installation of three building heating hot water pumps. Work at city of Las Vegas operated parking lot consists of all necessary planning, coordination and construction for temporary relocation of the (6) existing ADA parking spaces and restoration to the original location after completion of construction. Structural work consists of cooling tower supports and platforms, concrete pads and anchorage for all equipment, supports for piping and suspended equipment; wall and roof penetrations. Electrical work includes power distribution and service to all HVAC equipment and controls. Modifications to existing siemens switch gear to serve the requirements of temporary chillers and addition of 1000 amps fuses. Testing, adjusting and balancing of the hydronic system in multiple sessions as required due to project phasing. System commissioning per requirements of contract documents. Integration of the new and existing BACnet control system. This work shall be performed in multiple phases. Refer to mechanical and electrical drawings and specifications for information on phasing requirements of this project.

Award

Municipal

$5,699,502.00

Public - County

Renovation

61

44

17

8

Subscribe For Documents

51 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
30
Active Projects
15
Bidding Soon
387
All Active Projects
141
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 27, 2021

June 28, 2021

img_map_placeholder

270 E Clark Ave, Las Vegas, NV

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.