Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published May 28, 2022 at 8:00 PM
Updated September 14, 2023
Renovation of a municipal facility in Salem, New Hampshire. Completed plans call for the renovation of a municipal facility.
https://www.eagletribune.com/news/new_hampshire/selectmen-discuss-needs-at-salem-town-hall-major-renovation/article_2cb086a4-d7af-11ec-8e90-c3dd5394f8ba.html SALEM, N.H. -- Employees who work at Salem's 55-year-old Town Hall were asked recently what they would like to see in a renovated building, kicking off a prolonged planning process. Architects asked selectmen the same question this week, noting requests for a new meeting room that mirrors the state-of-the-art media studio at Salem High, an elevator for access to the second floor, and major technological upgrades to replace the existing web of cords and wires. Salem taxpayers will have the ultimate say at the polls once a final plan -- and price tag -- is determined. Town Hall has been eyed for major improvements since at least October 2017, when an evaluation solidified its spot on a short-list of town-owned buildings in dire need of repair or replacement. Public safety facilities are also on the list. Despite planning efforts that began five years ago, the pandemic put everything on hold and historic supply chain issues that followed have sent costs skyrocketing. Municipal Services Director Roy Sorenson estimated this week a cost increase of "40 to 50%, easily." Still, there are immediate concerns with the building, like limited handicapped accessibility, insufficient insulation and a cracked foundation that leaks water into the finished basement where records are stored. Some spots were discovered with only 3 1/2 inches of insulation -- less than half of what experts suggest -- and others with insulation pushed aside for mechanical work but never put back in place. Stained ceiling tiles from a leaky roof and missing documentation of the building's mechanical systems were also pointed out. "In general, the Salem Town Office building is definitely showing its age," the assessment reads. The report separated concerns into short, mid and long-term priorities. By 2022, only long-term priorities should have remained. Selectmen this week, speaking specifically about the Knightly meeting room used by all Salem boards and committees, explained a variety of issues, from space constraints to poor ventilation. Selectman James Keller deemed it, "horrific in terms of what we expect our physically challenged folks to participate in," stressing that easier access is needed. Selectwoman Cathy Stacey suggested more virtual opportunities to save residents from many trips to Town Hall. The architects are expected to continue gathering feedback before returning to selectmen in the coming months. _____________________________________________________________________________________________________________________________
Post-Bid
Municipal
$500,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed