Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a civil project in Pollock Pines, California. Design plans call for site work for a water / sewer project.
As of February 3, 2022, a selection has been made for this solicitation. Information regarding a general contractor is not available. A timeline for construction has not been determined. Closed solicitation has been included below for reference. ................... El Dorado Irrigation District (District), an irrigation special district organized and existing under the California Irrigation District Law (Water Code 20500, et seq.), hereby gives notice that it is now accepting proposals for engineering professional services for the District's Flume 45A, 46A, 47A, and 47B Replacement Projects as described in this Request for Proposals (RFP) It is the responsibility of the proposer to assure that the proposal is received prior to the deadline date and time. Proposals received after the submission deadline will not be accepted. EID encourages all proposers to send a test email to the delivery address ContractManagement@eid.org prior to proposal due date to confirm that they have the correct email address. Proposer may withdraw its proposal by written request via email to ContractManagement@eid.org before the Submittal Deadline. After that time, proposer may not withdraw its proposal for a period of ninety (90) days from the Submittal Deadline. The District will consider in its award decision, discount payment terms of twenty (20) days or more from receipt of invoice, provided that proposer clearly indicates such discounts in its proposal. Where proposer does not indicate discount payment terms in its proposal, the District will take it to mean that proposer does not offer discount payment terms, and therefore the payment will be considered net 30 days after receipt of invoice. The District is located in El Dorado County, on the western slope of the Sierra Nevada Mountains. Its contiguous service area covers approximately 220 square miles and 100,000 residents, ranging from El Dorado Hills in the west to Strawberry in the east, and from the South Fork American River in the north to the Cosumnes River in the south. The District also owns and operates Project 184, a FERC-licensed hydroelectric project including high mountain lakes in the vicinity of Lake Tahoe. The District provides treated water, wastewater treatment and disposal, recycled water, and recreation services and operates FERC Hydroelectric Project 184. It is a local public agency, governed by a five-member, elected board of directors with approximately 220 employees. Any questions regarding information within this RFP shall be submitted in writing via email to the Project Manager Mr. Cary Mutschler at cmutschler@eid.org. To be considered, questions must be received by the District no later than 5:00 p.m. on May 17, 2021. The District may, if deemed necessary, respond to such questions by issuance of formal written addenda, interpreting or clarifying the requirements of this RFP. The District may also issue addenda to modify the RFP as deemed advisable by the District. All such addenda shall be part of this RFP and binding upon each proposer. The District may, upon inquiry, direct a proposer's attention to specific provisions of the RFP which cover the subject of the inquiry. However, all supplemental information provided by the District during the RFP process shall not be binding unless communicated by formal written addenda. All addenda will be posted on the District's website. The method of contractor selection has not been determined at this time.
Design
Water / Sewer
$20,000,000.00
Public - County
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
December 16, 2022
Multiple Locations, Pollock Pines, CA
Related To This Project
Pollock Pines, CA
Bid Date: Oct 11 2023
Pollock Pines, CA
Bid Date: Jul 29 2020
Pollock Pines, CA
Bid Date: Feb 15 2024
Pollock Pines, CA
Bid Date: Feb 27 2024
Pollock Pines, CA
Bid Date: Mar 20 2024
Pollock Pines, CA
Bid Date: Apr 30 2024
Pollock Pines, CA
Bid Date: Jun 18 2024
Pollock Pines, CA
Bid Date: Jan 21 2022
Pollock Pines, CA
Bid Date: Mar 12 2024
Pollock Pines, CA
Bid Date: Sep 06 2018
Pollock Pines, CA
Bid Date: Jul 28 2023
Pollock Pines, CA
Bid Date: Aug 08 2023
Pollock Pines, CA
Bid Date: Jun 25 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.