BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 29, 2021 at 8:00 PM

Updated August 2, 2024

Site work and paving for a bridge / tunnel in West Bloomfield, Michigan. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Description This project consisits of the removal of (3) bridges within the Pebble Creek Development. Proposed work includes drain improvements, removal and installation of (3) new bridges with a guardrails, asphalt pavement, new guardrails and curb and gutter, water main relocation, storm sewer replacment, retreatment structures, and restoration located in West Bloomfield, Oakland County Michigan. The proposal has been structured to provide costs with the work associated with per bridge.

Bid Results

Bridges / Tunnels

$2,365,064.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
349
Active Projects
189
Bidding Soon
2,443
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2021

June 7, 2021

Project location map

Multiple Locations, West Bloomfield, MI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.