Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Carrollton, Georgia. Completed plans call for the renovation of a educational facility.
Mechanical and Electrical work to include replacement of existing Chiller and boiler for Aycock Hall Building including all corresponding hydronic and controls modifications for both systems. Deduct Alternate #1: The Contractor shall include in their bid the differential price of providing (2) 500 MBH boilers (base bid) and (1) 1000 MBH boiler, including the associated controls, electrical connections, installation, piping accessories, concrete pad, boiler flue, gas connection, etc. Deduct Alternate #2: The Contractor shall include in their bid the price to not pressure test the existing CWS/CWR piping between the Aycock service drive and the basement. A pressure test was performed in February 2021 for the entire portion of the underground existing CWS/CWR pipes. The pipes did not hold pressure, and it was concluded that the pipes were leaking underground. This deduct alternate would remove the additional testing to potentially reuse the western section of underground pipe (if this section passes pressure test) prior to any installation, trenching, etc. of the new CWS/CWR pipe. The Owner reserves the right to reject any or all bids and to waive technicalities and irregularities. The Owner further reserves the right, in its sole and completediscretion, to reject any bid that is over budget and to reject any bid from a bidder that is not responsible The deadline for Questions is April 29, 2021 by 5pm. and to achieve Material Completion by November 15, 2021. The existing remote air-cooled chiller at Aycock is to be replaced with a new water-cooled chiller. This new chiller is to be located within the basement mechanical room at adjacent Roy Richards Hall next to CH-1, which serves the building itself. The additional chiller will allow both buildings to operate as a single plant, increasing overall efficiency. Modifications at Roy Richards hall include the installation of valves, piping, controls, electrical connections, etc. to connect to new chiller CH-2, and new base-mounted pump P2C. Warranties for all Roy Richards hall equipment are expected to begin at material completion of that project, around June 6, 2021. All warranties in this building must be maintained during installation of new equipment. Chilled water lines to Aycock are extended partially to Aycock. This project intends to complete the connection to the Aycock basement mechanical room. Demolition work here includes the removal of piping, air separator, expansion tank, pump, controls, etc. New work includes new piping, installation of DP sensor, and controls. Some balancing work is required in the Aycock attic.
Award
Educational
$499,568.00
Public - State/Provincial
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 11, 2021
June 6, 2021
1601 Maple St, Carrollton, GA
Related To This Project
Carrollton, GA
Bid Date: May 30 2024
Carrollton, GA
Bid Date: May 14 2024
Carrollton, GA
Bid Date: Jun 03 2024
Carrollton, GA
Bid Date: Jun 11 2024
Carrollton, GA
--
Carrollton, GA
--
Carrollton, GA
Bid Date: Jul 12 2024
Carrollton, GA
Bid Date: Jul 15 2024
Carrollton, GA
Bid Date: Oct 05 2021
Carrollton, GA
Bid Date: Mar 19 2024
Carrollton, GA
--
Carrollton, GA
Bid Date: Oct 26 2021
Carrollton, GA
Bid Date: Apr 22 2019
Carrollton, GA
Bid Date: Mar 26 2024
Carrollton, GA
Bid Date: Mar 26 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.