BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in Sioux City, Iowa. Completed plans call for the construction of a 39,400-square-foot transportation facility; and office development.

The project will include the construction of a new 39,400 square foot aviation center with a flight school, two hangar bays and two stories of office space. As of August 6, 2021, city council plans to move forward with this project Information regarding a design team or a general contractor is not available. A timeline for construction has not been determined. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. New Aviation Center at Sioux Gateway Airport/ Brigadier General Bud Day Field - City of Sioux City The project is located at the Sioux Gateway Airport, 2403 Aviation Boulevard, and includes the construction of an approximately 299' x 117' (approximately 35,720 square ft) aircraft hangaralong with interior buildout, a 5,000 SF second floor consisting of the structural floor, and code required stairs to access the second floor (Bid Schedule A). Bid Schedule B includes the construction of an access road and parking lot, drainage, and utility connections. Bid Schedule C includes the rehabilitation of the existing apron. Bid alternate 1 includes the interior buildout of the second floor to allow for the successful operation of the future tenant. PN - BS21092 Addendum questions and substitution requests to be considered for the final addendum will be received until March 9, 2022 @ 5:00. The project is located at the Sioux Gateway Airport, 2403 Aviation Boulevard, and includes the construction of an approximately 284' x 117' (approximately 33,300 square ft) aircraft hangar along with interior buildout and a 5,000 square foot second floor, consisting of the structural floor and code required stairs to access the second floor (Base Bid). Alternate No.1 includes the addition of epoxy flooring to the hangar bays. Alternate No. 2 includes the build-out of the maintenance office space to allow for the successful operation by the future tenant. Alternate No.3 includes the build-out of the second floor to allow for the successful operation by the future tenant.

Award

Transportation Terminals

$13,644,584.00

Public - City

New Construction, Site Work

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
22
Active Projects
16
Bidding Soon
200
All Active Projects
69
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 2, 2022

June 3, 2022

img_map_placeholder

2600 Discovery Blvd, Sioux City, IA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.