BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Littleton, Colorado. Design plans call for site work for a road / highway.

https://www.littletonco.gov/files/sharedassets/public/finance/documents-finance/budget/2023finalbudget.pdf A detailed scope has not yet been determined Project is included City of Littleton 2023-2027 Capital Improvement Plan (CIP) Page 240 ____________________________________________________________________________________________________________________________________________________________________________________ As of March 16, 2022, an engineer has been selected. A firm timeline for construction has not been determined. *The closed solicitation has been included below for reference: Question Acceptance Deadline 04/27/2021 07:00 PM EDT Questions are submitted online Yes The City of Littleton is seeking statements of interest and qualifications from Consultants to design traffic operational improvements at the intersection of Santa Fe Drive (US 85) and Mineral Avenue. In 2019, the City of Littleton submitted a grant application for the Transportation Improvement Program (TIP) administered by DRCOG for operational improvements at the Santa Fe Drive and Mineral Avenue intersection. The city was successful in securing a project with a total cost of $11.44M, which is split 80% federal funding ($9.152M) and 20% local match ($2.288M). The awarded project amount equates to the cost estimate to construct a quadrant road in the southwest corner of the intersection, along with the necessary modifications to the existing roadway network and impacted traffic signals. The concept of the quadrant road is to remove left turning movements from the Santa Fe Drive and Mineral Avenue intersection and reroute those vehicles onto the quadrant road. This diversion allows all of the traffic signal green time to be dedicated to through movements either north-south on Santa Fe Drive or east-west on Mineral Avenue, which will reduce congestion and reduce the number of rear-end accidents. The City of Littleton will serve as the Local Participating Agency, with oversight provided by the Colorado Department of Transportation (CDOT). Participation Requirements - Disadvantaged Business Enterprise (DBE) General Requirements - Insurance Required - Federally Funded Vendors must be pre-qualified to provide services with CDOT and have a Master Pricing Agreement in place with CDOT. The method of Contractor Selection has not been Determined at this time.

Design

Roads / Highways

$7,652,000.00

Public - City

Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
96
Active Projects
39
Bidding Soon
1,003
All Active Projects
422
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2023

img_map_placeholder

Santa Fe Dr and Mineral Ave, Littleton, CO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.