Published March 16, 2023 at 8:00 PM

Updated January 26, 2024

Demolition, site work, renovation and addition to a water / sewer project in Charlottesville, Virginia. Design plans call for the addition of a water / sewer project; for the demolition of a water / sewer project; for the renovation of a water / sewer project; and for site work for a water / sewer project.

As of March 16, 2023, a design team has been selected for the project. A firm timeline for final design and construction has not been established. *The closed solicitation has been included below for reference: The University of Virginia (University or UVA) invites highly qualified engineering consulting firms to submit a letter of interest and associated supporting materials for consideration in the selection of a consultant team to provide engineering services to perform a plant expansion and optimization study for the Massie Road Central Utility Plant (CUP) in accordance with the provisions of the University of Virginia Higher Education Capital Outlay Manual (HECOM). This study will examine existing plant capacity and develop a plan, project scope, schedule, and budget estimate for expanding capacity to meet increased heating and chilled water demand associated with forecasted growth within the areas currently and potentially served by the Massie Road Plant. It is anticipated that once complete, this CUP study will provide the following deliverables: 1. A report showing optimization of the existing heating/ cooling infrastructure and any new infrastructure with the existing and new load profiles. This should include an examination of modifications to the existing building heating/ cooling systems that would allow overall plant/ system efficiency. The existing buildings include John Paul Jones Arena and the McCue Center. 2. A precinct plan including an evaluation of the impact and potential benefits/ risks of connecting the Massie Road Plant to the adjacent loops (the North Grounds loop and the Central Grounds loop). This should consider existing and emerging development Late submissions will not be accepted for any reason. The method of Contractor Selection has not been Determined at this time.

Design

Water / Sewer

$10,000,000.00

Public - State/Provincial

Addition, Demolition, Renovation, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
231
Active Projects
122
Bidding Soon
1,762
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2023

Project location map

Massie Rd, Charlottesville, VA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.