BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and paving for a mixed-use development in Marysville, California. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The work in general consists of placing and/or replacing drain culverts and storm drains, placing curb, gutter, and sidewalk, hot mix asphalt overlay, pulverizing existing roadway, the placement of pavement striping along 11th. Avenue from Olivehurst Avenue to Powerline Road. Other such items or details not mentioned above that are required by the plans, Standard Specifications, or these Special Provisions, and as directed by the Engineer, shall be performed, placed, constructed or installed. The estimated cost of the project is $1,622,520. Complete the work within 75 working days. No pre-bid meeting will be scheduled for this project. Each bid shall be accompanied by a certified cashiers check, or bid bond, in the amount of 10 percent of the total bid price, payable to Yuba County Department of Public Works, as a guarantee that the bidder, if its bid is accepted, will promptly execute the Agreement. The bidder shall guarantee the total bid price for a period of 60 days from the date of the bid opening. Question Submission Deadline:April 22, 2021, 5:00pm Question Response Deadline:April 23, 2021, 5:00pm

Bid Results

Roads / Highways

$2,157,770.00

Public - County

Paving, Site Work

39

8

3

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
73
Active Projects
34
Bidding Soon
699
All Active Projects
267
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 28, 2021

June 28, 2021

img_map_placeholder

11th St, Marysville, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.