BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 17, 2021 at 8:00 PM

Updated October 22, 2025

Site work for a bridge / tunnel in Vero Beach, Florida. Completed plans call for site work for a bridge / tunnel.

The project will consist of the replacement of an existing culvert at the intersection of 4th Street and 90th Avenue, in the Indian River Farms Water Control District Sub-Lateral D-4 Canal. The proposed pipe will be a 96" Reinforced Concrete Pipe (RCP) with Rip-Rip Rubble end treatment at the upstream, southerly end of the pipe. Other work will include sheet piling, temporary canal bypass, earthwork, sodding, maintenance of traffic, erosion control and any other incidental work required to complete the project. All material and equipment furnished and all work performed shall be in strict accordance with the plans, specifications, and contract documents pertaining thereto. If Bidder fails to do so, the Bid Security shall be retained by the County as liquidated damages and not as penalty. The County reserves the right to delay awarding of the Contract for a period of ninety (90) days after the bid opening, to waive informalities in any bid, or reject any or all bids in whole or in part with or without cause/or to accept the bid that, in its judgement, will serve the best interest of Indian River County, Florida. The County will not reimburse any Bidder for bid preparation costs. All bidders shall submit one (1) original and one (1) copy of the Bid Proposal forms provided within the specifications. Please note that the questionnaire must be filled out completely including the financial statement. BID SECURITY must accompany each Bid, and must be in the form of an AIA Document A310 Bid Bond, properly executed by the Bidder and by a qualified surety, or a certified check or a cashier's check, drawn on any bank authorized to do business in the State of Florida. Bid Security must be in the sum of not less than Five Percent (5%) of the total amount of the bid, made payable to Indian River County Board of County Commissioners. In the event the Contract is awarded to the Bidder, Bidder will enter in a Contract with the County and furnish the required 100% Public Construction Bond and certificates of insurance within the timeframe set by the County.

Award

Bridges / Tunnels

$334,472.00

Public - County

Site Work

9

16

2

7

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
239
Active Projects
69
Bidding Soon
1,626
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 19, 2021

June 18, 2021

Project location map

4th St & 90th Ave, Vero Beach, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.