BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Saint Joseph, Missouri. Completed plans call for site work for a development; sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

As of May 19, 2021 a Resolution (#1121-18) authorizing the execution of a Unit-Price Contract with Scott Gann Construction for the Corby Pond Restoration Project in the amount of $836,757.00. The start and completion date has not yet been determined. The Work generally consists of demolition, clearing and grubbing, excavation, burrow, grading, pipework, asphalt pavement, curbs, modular block wall, sidewalks, seeding, mulching and all appurtenant work as indicated on the drawings and as specified. Bid security in the amount of Five Percent (5%) of the total Bid must accompany each Bid The Successful Bidder will be required to furnish a Performance and Maintenance Bond and a Payment Bond on the forms set forth in the Contract Documents as security for the faithful performance of, and the payment of all bills and obligations arising from the performance of, the Contract. Bidders will be required to comply with the following requirements: Wage Rates Equal Opportunity in Employment All other applicable Laws and terms and conditions set forth in the General Conditions of the Contract for Construction Nondiscrimination in Employment. Bidders on this Work will be required to comply with the President's Executive Order Number 11246. Requirements for Bidders and contractors under this order are explained in the Specifications. No Bid may be withdrawn within a period of Ninety (90) days after the date fixed for opening Bids. Bidder agrees that the Work will be substantially complete within Ninety (90) Working days from Notice to Proceed, and completed and ready for final payment in accordance with General Conditions within One-Hundred (100) Working Days from Notice to Proceed, after the commencement of Contract Times as defined in the General Conditions. The Performance and Maintenance Bond and the Labor and Material Payment Bond shall each be in an amount equal to the Contract Sum. The Performance and Maintenance Bond may be reduced to fifty percent (50%) of the Contract Sum during the one (1) year correction period as set forth in the Contract Documents;

Award

Conservation and Development

$836,757.00

Public - City

Paving, Site Work

15

14

2

4

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
83
Bidding Soon
1,350
All Active Projects
557
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

May 4, 2021

June 3, 2021

October 21, 2021

img_map_placeholder

2202 Northeast Pkwy, Saint Joseph, MO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.