BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Miami, Florida. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

As of April 25, 2022, information regarding award and award date has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fiscal year 2024. *The closed solicitation has been included below for reference: Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 06 Selection Method : Letter of Response and Abbreviated Technical Proposal TRC Members (Subject to Change) : Gerardo Dragoni Jose Barrera Ronald Pierre-Louis The goal of the Departments Under-Utilization strategy is to encourage and promote use of Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-Utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. The specific Under-Utilized Work Groups are identified in the advertisement. SR 932/ NW 103rd Street/West 49th Street from West of NW 82nd Avenue to East of West 6th Avenue Preserve and extend service life of the existing pavement and to improve pedestrians and motorists safety as well. Shortlisted Firms will be provided with the RFP. Shortlisted firms must consult the RFP for actual Due Dates and Times. Tentative Forms, Org Chart or Staffing Chart, Resumes Due Date: Friday, June 4, 2021 Tentative Interview Date: Monday, June 7, 2021 Longlist Date/Time 5/12/2021 02:30 am Shortlist Selection Date/Time 5/17/2021 07:30 pm Phase II Submittal Deadline Date/Time 6/04/2021 12:30 pm Final Selection Date/Time 6/28/2021 07:30 pm Negotiations Period Begin Date 7/06/2021 Negotiations Period Ending Date 9/01/2021 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - Sr 932/nw 103 St/w 49 St From W of Nw 82 Ave to E of W 6 Ave

Conceptual

Roads / Highways

$6,912,352.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
47
Bidding Soon
1,097
All Active Projects
488
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.