Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 27, 2025 at 8:00 PM
Updated August 28, 2025
Demolition, site work and addition to an educational facility in Chicago, Illinois. Completed plans call for the addition of a 26,000-square-foot, three-story above grade educational facility; for the demolition of a educational facility; for site work for a educational facility; and educational facility.
Innovation Centre Expansion. Virtual participants must confirm their participation remotely by September 26th, 2024, at 4:00 pm. If you have any further questions or need additional information, feel free to ask the A/E or CDB Project Manager. GENERAL: 15,000 SF addition to the UIC Innovation Center that will include a large co-working area, workshop space, offices, presentation room, and loading dock. The Innovation Center expansion will be located adjacent to the Student Services Building, on the site of the recently demolished parking structure at the corner of Harrison and Throop Street, Chicago. ELECTRICAL: New electrical system for building addition consisting of new service, distribution system, wiring devices, lighting, and equipment connections. Electrical service shall be 800A at 480Y/277V and originate from a utility transformer. Normal power distribution include branch panelboards and step-down transformer to supply necessary power to new wiring devices, lights, and equipment. Emergency power provided through individual emergency batteries. New low voltage systems such as cabling, racks, wiring devices, and associated accessories to support telecommunications system expansion to building addition. New low voltage systems such as security support infrastructure and access control system expansion to building addition. FIRE ALARM: Replacement fire alarm control panel found in existing building. Fire alarm control panel shall accommodate existing devices being addressed in separate UIC scope of work and the proposed new devices. New addressable fire alarm system devices to accomplish full coverage of new building addition and compliance and compatibility with UIC standards.
Under Construction
Educational
$12,391,000.00
Public - State/Provincial
Addition, Demolition, LEED Certification, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
October 29, 2024
December 17, 2024
1200 W Harrison St, Chicago, IL
Related To This Project
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: Feb 17 2023
Chicago, IL
Bid Date: Oct 04 2022
Chicago, IL
--
Chicago, IL
Bid Date: Nov 15 2022
Chicago, IL
Bid Date: Jan 05 2023
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: Mar 12 2024
Chicago, IL
Bid Date: Mar 15 2024
Chicago, IL
Bid Date: Jan 18 2023
Chicago, IL
--
Chicago, IL
Bid Date: Sep 20 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
